My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010129
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1500
>
3500 - Local Oversight Program
>
PR0545688
>
ARCHIVED REPORTS_XR0010129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 3:36:39 PM
Creation date
5/21/2020 9:59:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010129
RECORD_ID
PR0545688
PE
3528
FACILITY_ID
FA0003634
FACILITY_NAME
CANTEEN CORPORATION
STREET_NUMBER
1500
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14326008
CURRENT_STATUS
02
SITE_LOCATION
1500 N SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IFormer Canteen Facility July 1,2004 <br /> Quarterly Groundwater Monitonng Report Pa e 6 <br /> IDuring this quarter, the system was shutdown for repairs and maintenance on the following <br /> dates <br /> Date Off Date on Time Off Actions Taken <br /> 5/1/04 512104 31 hours Out of propane <br /> 5118104 5120104 48 hours Replace sark lu s <br /> I6/14/04 6/30/04 16 days New plug wires, and new <br /> engine heads <br /> RECOMMENDATIONS <br /> IAES recommends the following for the Former Canteen Facility <br /> • Continue groundwater monitoring and reporting, including measurement of depth to <br /> groundwater in each well, evaluating monitor well status, preparation of a <br /> potentiometric surface contour map containing the calculated gradient and <br /> approximate rate of groundwater movement, and, preparation of isoconcentration <br /> contour maps for benzene and TPH(g) at the two different screened aquifer depths <br /> • The schedule for groundwater monitoring is as follows <br /> Quarterly Monitoring Annual MonitorinIZ <br /> I (15`, 2nd, and 3rd Quarters) (4'h Quarter) <br /> MW-3, MW-3A, MW-31), MW-I I All Wells <br /> MW-13, MW-13A, MW-13B <br /> Each well will be gauged quarterly If an analyte is not detected by the laboratory for <br /> two consecutive quarters, then that analyte will only be monitored for during the <br /> annual event AES understands that should a removed analyte be detected in a <br /> monitor well during annual monitoring, quarterly monitoring and analysis will <br /> I resume for that well Groundwater monitoring will be performed during the second <br /> month of each quarter and quarterly monitoring reports will be submitted to the <br /> appropriate County and State agencies by the 15`h of the first month following the end <br /> of each quarter <br /> • Continue operation of the soil and groundwater remediation system and conduct <br /> I weekly operation and maintenance activities Influent and effluent air samples will <br /> be collected periodically for laboratory analysis to assess the extraction and treatment <br /> efficiency of the remediation system The remediation system operation and <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.