Laserfiche WebLink
I <br /> TABLE OF CONTENTS <br /> I <br /> 1.0 Executive Summary 1 <br /> 2.0 Assessment of the Impacts 2 <br /> 2.1 Contaminant Characteristics 2 <br /> 2.2 Hydrogeologic Characteristics 2 <br /> 2.3 Sensitive Receptors 3 <br /> 3.0 Determination of Applicable Cleanup Levels 4 <br /> 4.0 Feasibility Study and Workplan 4 <br /> 4.1 Remediation Technologies Evaluation 4 <br /> 4.2 Technologies Screening Summary 8 <br /> 4.3 Pilot Testing 9 <br /> 4.4 Recommended Remediation Technology 13 <br /> 4.5 Technology Implementation Workplan 14 <br /> 5.0 CAP Monitoring and Reporting 15 <br /> 5.1 CAP Monitoring Plan 15 <br /> 5.2 CAP Reporting 15 <br /> ITABLES <br /> Table 1 Historical Soil Analytical Results <br /> Table 2 Historical Potentiometric Surface Elevations <br /> Table 3 Historical Groundwater Analytical Results <br /> Table 4 SVE Pilot Test Data <br /> Table 5 Sparge Pilot Test Data <br /> Table 6 Combined Sparge/SVE Pilot Test Data <br /> IFIGURES <br /> I Figure 1 Topographic Site Location Map <br /> Figure 2 Site Map <br /> Figure 3 Cross Section Location Map <br /> I Figure 4 Cross Section A—A' <br /> Figure 5 Cross Section B —B' <br /> Figure 6 Soil Boring Location Map <br /> Figure 7 Groundwater Gradient Map <br /> Figure 8 Conceptual Treatment System Design <br /> *jGUL <br /> O <br /> I � LACES� <br />