Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> PROJECT NAME:Canteen CW. SAMPLE ANALYSIS PERFORMED ;TPH Gas,B,TX.E <br /> 15M Shaw Read SAMPLETIIME* 17,16 <br /> Stockton, CA SAMPLE NTAINEFI(S}- Pno1II et) By LAB <br /> 3 VO.A`s <br /> LAS.ANALYSIS COMPLETED BY,. SHERWOOD <br /> CLIENT HUNTER &ASSOCIATES DATE 03/29/95 <br /> PROJECT MANAGER BILL HUNTER SAMPLE LOCATION MW-7 <br /> AMPLER DON LIGHT START TIME <br /> GROUNDWATER XXX ]EADOSE OTHER P I D WELL HEAD READING 0 0 PPM <br /> CASING ELEVATION {FEET MSL} CASING DIAMETER 4 INCH <br /> DEPTH TO WATER. 53 52 FEET ICALCULATED PURGE VOLUME 16 8 GAL <br /> DEPTH OF WELL 79 34 FEET 1ACTUAL VOLUME PER PURGE- 17 00 GAL <br /> TIME VOLUME PH E.O.` TEMP, COLOR OTHER <br /> galtans units uhascm Elerees C (Visual) <br /> 1418 0 75 541 212 LT TURBID MUSTY <br /> ODOR <br /> 170 75 558 209 CLEAR " <br /> 340 75 547 209 NO ODOR <br /> 51 0 75 569 205 " <br /> PURGE METHOD 2" GRUNDFOS PUMP <br /> SAMPLE METHOD 1 FOOT STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE 53 43' DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY- CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS. GOOD RECHARGE <br /> WEATHER- CLEAR SKIES <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER & ALCONOX <br /> GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION ON THE SOUTHWEST END <br /> CONTAINMENT DO T 17 DRUMS <br /> INSTRUMENTATION ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />