Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> i <br /> MONITORING WELL FIELD LOG <br /> PROJECT DAME; Canteen Cmirp. SAMPLE ANALYSIS PERFORMED : TPH-Gas, B.T X.E <br /> ISM Shaw Road SAMPLE TIME: 1616 <br /> Stilton, CA SAMPLE CONTAINER($), PROVIDED BY€.AES <br /> 2VOA's <br /> k.AI3. ANALYSIS COMPLETED BY., SHERW€ OD <br /> CLIENT HUNTER & ASSOCIATES ATE 04/21/94 <br /> PROJECT MANAGER BILL HUNTER AMPLE LOCATION MW-2 <br /> AMPLER DON LIGHT START TIME <br /> GROUNDWATER XXX ADOSE OTHER <br /> CASING ELEVATION (FEET MSL) CASING DIAMETER 4 INCH <br /> DEPTH TO WATER. 70 52 FEET CALCULATED PURGE VOLUME 6 8 GAL <br /> DEPTH OF WELL 80 96 FEET CTUAL VOLUME PER PURGE 7 0 GAL <br /> TIME VOLUME U€>tll* P f . ` EMP. COLOR OTHER <br /> • -gallons units umtosfcm Degrees C (Visual) <br /> 0 67 630 237 BRN TURBID NO ODOR <br /> 7 69 678 202 " <br /> 14 71 667 196 LT TURBID " <br /> 21 71 650 201 CLEAR " <br /> 28 71 658 202 " " <br /> PURGE METHOD GRUNDFOS 4" STAINLESS STEEL SUBMERSIBLE PUMP <br /> SAMPLE METHOD 1 FOOT STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY CAP AND SEAL ARE SECURE, NO LOCK WAS INSTALLED <br /> REMARKS VERY SILTY <br /> WEATHER CLEAR SKIES <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER & ALCONOX <br /> GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION WELL IS LOCATED ON THE SOUTH/EAST CORNER OF THE LOT <br /> CONTAINMENT DO T 17 DRUMS <br /> INSTRUMENTATION. ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> . ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br /> RECENED AeR <br />