Laserfiche WebLink
r�7 PERM 200 - 17 <br /> Use this test procedure in conjunction with the as designed , flow restriction occurs when the tank <br /> manufacturer ' s installation and maintenance is no more than 90 percent full , and the tank-top <br /> instructions . fittings are vapor-tight. <br /> Visually verify that all tank-top fittings are leak- If any of the following configurations exist, the <br /> free and vapor-tight before starting the test proce- overfill prevention system fails the inspection . <br /> dure. If any fittings are loose, the ball float valve ball float valves are installed in storage systems <br /> will not restrict flow. <br /> that are equipped with suction pumps and air <br /> Inspect the drop tube to ensure that it does not have eliminators ; <br /> an automatic shut off device. the ball is cracked or damaged; <br /> 7.2 . 6 Inspection Procedure. the ball float cannot be removed; <br /> 1. Remove the ball float valve assembly from the the orifice is not at the top of the assembly, or is <br /> tank. clogged with debris or corroded, which would <br /> 2. Visually inspect the ball float and cage. Remove prevent proper air flow after activation; <br /> any debris or foreign objects . ball float valves are installed with coaxial Stage <br /> 3 . Check the ball for holes and cracks . It should I vapor recovery ; <br /> move freely in the cage. Check for corrosion ball float valves are used on tanks equipped with <br /> that affects the operation of the ball float. remote-fill pipes and gauge openings without <br /> 4. Check the vent orifice in the vent-restriction the use of "trap door" devices; or <br /> pipe. It must be open and located near the top of ball float valves are installed in storage systems <br /> the tank, that also are equipped with automatic shutoff <br /> S. Use the ball float valve manufacturer 's devices and the ball float valve is set to restrict <br /> installation procedure to determine if vapor flow flow before the tank is 95 percent full . <br /> will be restricted when the tank is no more than If the ball float valve does not function as designed, <br /> 90 percent full. flow restriction does not occur until the tank is <br /> 6 . After inspection of the ball float valve assembly, more than 90 percent full, or the tank-top fittings <br /> reinstall it following the manufacturer 's installa- are not vapor-tight, the ball float valve fails the <br /> tion instructions . inspection. <br /> 7.2. 7 Pass/Fall Criteria. The ball float valve NOTE. When permanently removing a ball <br /> passes the inspection if the ball float valve functions float, ensure that the entire assembly is <br /> removed so as not to interfere with other <br /> methods of overfill prevention . <br /> - 7.3 Overfill Alarms. <br /> 7 .3 .1. General. Overfill alarms provide an audi. <br /> ble and/or visible warning to the fuel delivery <br /> driver if the product level in the UST reaches the <br /> 90 percent level during a delivery. They are often <br /> an integral part of the automatic tank gauge (ATG) <br /> rL. <br /> system. An overfill alarm does not stop or restrict <br /> product flow. <br /> 7.3.2 Purpose . The purpose of this inspection <br /> , is to verify that the overfill ll alarm is operating <br /> rectly and is set to provide a warning when the tank <br /> FIGURE 7 3 To <br /> avoid <br /> damage <br /> when removing o <br /> rein is no more than 90percent full . <br /> stalling the ball float, use an extractor tool recommend- <br /> ed by the ball float manufacturer. <br /> pei.org <br />