Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Pages 4 of s) <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? © ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ❑ <br /> functionallt tested, and confirmed operational? <br /> Were all sensors Installed at lowest point of secondary containment and positioned so that other equipment will not interfere with HEItheir ro er o eration ?Was monitoring system set-up reviewed to ensure proper settings? ❑ <br /> Was the monitoring panel's backup battery visually inspected , functionally tested, and confirmed operational? ® ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? u ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically © ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ❑ ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) Z Sump ® Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e. g . , modem) operational? Q ❑ ❑ <br /> For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> Replaced TLS Battery for PM Purpose , <br /> I <br /> C <br /> I <br /> I <br /> i <br /> i <br /> I <br /> i <br /> E <br /> X. INJANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control. (Do not complete this section .) <br /> F1Check this box if NO tank gauging equipment is Installed . (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gau ing Is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for ® ❑ ❑ <br /> round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely , functionally ❑ ❑ ❑ <br /> tested , and confirmed operational? <br /> Was accuracy of system's product level readings tested ? ® ❑ ❑ <br /> Was accuracy of system's water level readings tested? [� ❑ ❑ <br /> Were all probes reinstalled properly? ® ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? Q ❑ ❑ <br /> For any answer of "N" above, describe in Section Xl how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br />