Laserfiche WebLink
r <br /> ENVIRONMENTAL HEALTH DEPARTMENT, SAN JOAQUIN COUNTY 6573.4.002.02 <br /> Haggerty and Anderegg Parcels June 1, 2006 <br /> WORK PLAN FOR GROUNDWATER COLLECTION Page 2 <br /> All samples will be collected as follows; <br /> • Non-filtered groundwater samples will be collected using %-inch-diameter flexible tubing <br /> inserted into a peristaltic pump for each location and decanted into pre-cleaned analyte specific <br /> laboratory sample containers. <br /> • Soil samples will be collected using a Geoprobe continuous core sampler. <br /> • All samples will be placed in an ice-chilled cooler and transported under documented <br /> chain-of-custody to an accredited analytical laboratory. <br /> At least 48 hours prior to pushing the Hydropunches, we will mark the site for an Underground <br /> Service Alert (USA) utilities check. Following the completion of probes, the holes will be <br /> backfilled with neat cement grout in accordance with San Joaquin County regulations. <br /> If you have any questions on any portion of this work plan, please call and we will be glad to <br /> discuss them with you. <br /> Very truly yours, <br /> ENGEO INCORPORATED Reviewed by: <br /> Richard Gando fo Duncan Hickmott, C.E.G. <br /> Cc: Pete Peterson, Brookfield Homes <br /> Attachments: Figure 1 — Site Plan <br /> Figure 2—Hydropunch Well Location Map <br />