Laserfiche WebLink
John O. Van Duyn 6573.4.003.01 <br /> APN 245-180-04, 245-180-06, and 245-180-08 6573.4.003.02 <br /> WORK PLAN FOR GEOTECHNIC IRONMENTAL SERVICES July 27, 2006 <br /> Page 2 <br /> SCHEDULE <br /> We plan to begin the environmental site reconnaissance and geotechnical field exploration within <br /> two weeks after authorization to proceed. We estimate that the time required to complete the <br /> on site portion of our work will be one or two days. Once our schedule is set we will notify you <br /> at least 24 hours prior to our arrival on site. <br /> SITE ACCESS <br /> Necessary removal of fences, unlocking of gates, and permission to enter the site from the current <br /> owners or leaseholders is required prior to initiating our subsurface exploration and site <br /> reconnaissance <br /> If you are in agreement with the scope of services outlined in this work plan, please sign the <br /> bottom portion of this letter and return to us or to Troy Wright(Brookfield Homes) via fax. <br /> If you have any questions, please do not hesitate to contact us. <br /> Very truly yours, <br /> ENGEO INCORPORATED Reviewed by: <br /> oG - <br /> ac Crawfo d &Puncan Hickmott <br /> zc/drh/jf:wr pin <br /> cc: 1 -Mr. Troy Wright, Brookfield Homes <br /> I, �/ V .a, v I , as property owner of the above referenced property do <br /> herby grant permission to NGEO Incorporated and their subcontractors to enter the subject <br /> property and conduct a subsurface exploration and environmental site reconnaissance as <br /> described in the work plan dated July 27, 2006. <br /> X- <br /> gnature Printed Name <br />