Laserfiche WebLink
J.M. Equipment Co.Inc.,Facility(11754), Used Oil Tank, 22§CCR 66265.192&STI-SP0011 November 2019 <br /> B.2 Tightness Test (Primary Tank Leak Test) <br /> The Used Oil tank did not pass the tightness test and is not considered leak tight. The <br /> North Head has two 1/4"holes drilled into it, compromising the tank's ability to be leak tight. <br /> 17 <br />