Laserfiche WebLink
Edna Rolleri c/o Donna Bruno <br /> Page 2 <br /> The selection of the remedial alternative will be made only upon <br /> review and consideration of comments received during the public <br /> comment period. The public comment period for the draft RP will <br /> extend from June 1, 1991 to July 1, 1991. <br /> A permit for the extraction well must be secured from this office <br /> by a contractor with a current C-57 license. Before this permit <br /> will be issued, an addendum to the work plan must be submitted to <br /> this office stating plans for disposal of the soil removed during <br /> installation of the vapor extraction well, the name .-of the <br /> laboratory that will analyze the soil samples, and a site specific <br /> health and safety plan. <br /> Please be advised that vapor extraction of the vadose zone is' an <br /> interim remedial action because groundwater levels have receded and <br /> that a groundwater investigation/remediation will have to be <br /> completed before site certification can be considered. <br /> If you have any questions contact Magaret Lagorio, Senior REHS, at <br /> (209) 468-3449 . <br /> Jogi Khanna, M. D. , M.P.H. <br /> Health cer <br /> U <br /> aurie A. Cotulla, REHS, Program Manager <br /> Environmental Health Division <br /> LAC/ML:nr <br /> c: CVRWQCB <br /> c: Geological Audit Services, Inc. <br /> 22911 Savi. Ranch Parkway <br /> Yorba Linda, CA 92687 <br />