Laserfiche WebLink
�y • I I G 111 U (- a (i (I U f(ivoo <br /> CRLIFORNIR REGIONRL WRTER OURLITY CONTROL BURRO CENTRRL URLLEY REGION <br /> 3443 Routier Road Phone: (916) 361-5600 <br /> Sacramento,California 95827-3096 ATSS: 8-495-5600 <br /> TO: Ton Vorster 1014: Gordon Lee 13oggs <br /> (Laurie CotuIla F Underground Tank <br /> 'Dfarie`Hinsanti° Program Coordinator <br /> Dave�Carls, &nM) <br /> DATE: 22 June 1988 SIGNATURE: <br /> SUBJECT: COM 4MEMS ON WORKPLANS FOR SAFEWAY, 1111 NAVY DR. , <br /> STOMON; ROBERTS OIL, LODI; TRI VALLEY GROWERS, <br /> THORNTON; SOUTHLAND (7-11), GRANTLINE, TRACY; UNOCAL, <br /> i <br /> 4707 PACIFIC AVE., STOCKTON; AND GENOVA BAKERY,STOCKTON- <br /> Safewa iiit Nav i Drive Stockton <br /> Joe Theisen of Weiss Associates called on 20 June 1988 about the <br /> monitor well placement and soil excavation need in order to leave the <br /> Underground Tank (UT) concrete cradle in place. Because MW 3 and <br /> Boring 2 show that the area is interspersed with sand layers, it is not <br /> easy to determine the movement of the diesel at the site. We also <br /> decided that to put MW 4 on the downgradient side of the cradle would <br /> duplicate what they have now and would be too far away for a point <br /> Of compliance. Therefore, Weiss will submit an amended workplan <br /> that will place MW 4 closer to the source of contamination and better <br /> define how the excavation of the site will take place. Boring 2 showed <br /> contamination at 20.7 feet which is three feet below the current water <br /> level. They also must explain that and determine how the excavation <br /> Will accomodate the removal of the contaminated soil above and below <br /> the water table. The placement and rationale for MW 4 is to be <br /> included. <br /> Ro rtLOil Odl <br /> Kent Parish of Ensco (formerly Exceltech) called on 21 June to discuss <br /> their proposal to begin work at the Roberts Oil site. The last work was <br /> done in 3985 by Kleinfelder Associates. Arter talking to Laurie C.otulla <br /> later in the day, we both were unaware that Ensco had begun work <br /> about a month ago. Kent is to prepare a workplan according to the <br /> Regional Board reporting guidelines. Copies of the new guidelines and <br /> the 1,2,5 investigation recommendations also were sent to Kent. <br />