My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010350
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIERRA NEVADA
>
749
>
3500 - Local Oversight Program
>
PR0545690
>
ARCHIVED REPORTS_XR0010350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2020 11:34:04 AM
Creation date
5/22/2020 11:28:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010350
RECORD_ID
PR0545690
PE
3528
FACILITY_ID
FA0005203
FACILITY_NAME
GENOVA BAKERY
STREET_NUMBER
749
Direction
N
STREET_NAME
SIERRA NEVADA
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15107406
CURRENT_STATUS
02
SITE_LOCATION
749 N SIERRA NEVADA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 28 May 1991 <br /> GeoAudit CV 43C4 . 1. 1 - Work Plan for Vacuum Extraction <br /> ' Page 8 of 10 <br /> The data presented here are based upon the operation of the Vaclean <br /> 1000 using propane as supplementary fuel. The use of natural gas <br /> for this purpose has several additional advantages. Natural gas, is <br /> less expensive than propane and is readily available at the site. <br /> ' Natural gas promotes not only a more complete combustion of the <br /> hydrocarbon contaminants, it is also proven to burn very cleanly, <br /> leaving practically no by-products. <br /> 8 . MONITORING PROGRAM <br /> To maximize the degradation of hydrocarbons, vapor from the <br /> extraction wells is monitored for the presence of volatile <br /> organics. A weekly-monthly monitoring is scheduled for this <br /> purpose. <br /> A decrease of the organic vapor content is anticipated to occur <br /> within the first weeks. Upon reaching a constant level of typically <br /> between 500 to 1, 000 ppm as hexane, a confirmatory sampling is <br /> scheduled (see Section 9 6) . A treatment period between 6 to 18 <br /> months is estimated. <br /> 9 . DETAILED WORK PLAN <br /> 9 . 1. INSTALLATION OF VACUUM EXTRACTION SYSTEM <br /> 1) Construct a lockable station in the northern portion of <br /> the storage structure. <br /> 2) Affix noise insulator at the inside of the structure. <br /> ' Provide openings for natural gas and extraction lines. <br /> 3) Extend the existing natural gas line and provide a proper <br />' connection to the vacuum extraction unit. This item is <br /> conducted by PG&E personnel. <br />' 9 . 2 . INSTALLATION OF EXTRACTION WELL <br /> The items for this plan are detailed in a separate work plan, which <br /> was submitted to the SJEHD on 21 March 1991. <br /> 9. 3 . INSTALLATION OF VAPOR EXTRACTION LINES <br />' 4) Connect a 2-inch diameter PVC (Schedule 40) line to the <br /> extraction wells. Install. ball valve at each line for <br /> individual and manifold extraction selection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.