My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010350
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIERRA NEVADA
>
749
>
3500 - Local Oversight Program
>
PR0545690
>
ARCHIVED REPORTS_XR0010350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2020 11:34:04 AM
Creation date
5/22/2020 11:28:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010350
RECORD_ID
PR0545690
PE
3528
FACILITY_ID
FA0005203
FACILITY_NAME
GENOVA BAKERY
STREET_NUMBER
749
Direction
N
STREET_NAME
SIERRA NEVADA
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15107406
CURRENT_STATUS
02
SITE_LOCATION
749 N SIERRA NEVADA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 28 May 1991 <br /> GeoAudit CV 43C4 . 1. 1 - Work Plan for Vacuum Extraction <br /> Page 10 of 10 <br /> 1 <br /> 9 . 6. CONFIRMATORY SAMPLING <br /> Upon indication of positive monitoring results, confirmatory <br /> sampling is conducted. The following items need to be performed: <br /> ' 16) Drill confirmatory borings within the lateral extent of <br /> the contamination to a previously specified depth using <br /> truck mounted hollow stem augers. The location, number <br /> and total depth of the borings is subject to discussion <br /> with, and final approval of the SJEHD. <br /> ' 18) Obtain discrete soil samples using a split-tube sampler <br /> at 5--foot .intervals starting from a depth 10 feet from <br /> the borings. <br /> 19) Wash sampling equipment in tri-sodium phosphate (TSP) <br /> solution and rinse twice with water prior to each <br /> sampling run. <br /> 20) Transport soil samples in a chilled container to a State <br /> certified laboratory within 24 hours. <br /> ' 21) Analyze selected soil samples for total petroleum <br /> hydrocarbon (TPH) in accordance with DHS approved method <br /> ' for gasoline and for purgeable aromatic hydrocarbons <br /> (BTE&X) in accordance with EPA method 8020 . The number of <br /> soil samples to be analyzed is subject to discussion <br /> with, and final approval of the SJEHD. <br /> 22) Backfill the borings with concrete/bentonite slurry and <br /> restore surface seal with concrete. <br />' 9 . 7 . PROJECT SUPERVISION <br />' 23) Notify the SJEHD 48 hours prior to any field work <br /> initiation. <br /> 24) Prepare a progress report detailing the results of the <br /> vapor monitoring and submit the report to the SJEHD and <br /> the APCD. <br /> 25) Upon completion of the cleanup project, prepare a final <br /> report detailing the results in a format to be submitted <br /> to the SJEHD. <br /> r <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.