Laserfiche WebLink
MEMORANDUM <br /> TO: RON ROWE <br /> FROM: MARGARET LAGORIO <br /> DATE: JANUARY 30, 1997 <br /> RE: Issuance of Monitoring Well /Soil Boring Permits <br /> I discussed with Carl Borgman today the use of more than one SR number on a <br /> permit and he stated that it was applicable to Unit 2 permits because their fees <br /> are per well and if someone wanted to install 2 wells on one parcel there would <br /> be a fee for each well. They are still required to take a separate permit out for <br /> each parcel. <br /> Site mitigation permits have always been issued per parcel or site (landowner <br /> owns adjacent parcels that are considered one site). This policy is still in effect, <br /> so the permits for the Occidental Chemical work should be issued accordingly. <br />