My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 12:27:33 PM
Creation date
5/26/2020 10:13:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VI FINANCIAL RESPONSIBILITY <br />1. Cost estimate for facility closure. <br />(a) The owner or operator shall have a written estimate of the <br />cost of closing the facility in accordance with the applicable <br />closure requirements of this document. The owner or operator <br />shall keep this estimate, and all subsequent estimates, at the <br />facility. The estimate shall equal the cost of closure at the <br />point in the facility's operating life when the extent and <br />manner of its operation would make closure the most expensive, <br />as indicated by its closure plan. <br />(b) The owner or operator shall prepare a new closure cost estimate <br />whenever a change in the closure plan affects the cost of <br />closure. <br />(c) On each anniversary of the effective date of this document, <br />the owner or operator shall adjust the latest closure cost <br />estimate using an inflation factor derived from the annual <br />Implicit Price Deflator for Gross National Product as published <br />by the U.S. Department of Commerce in its Survey of Current <br />Business. The inflation factor shall be calculated by dividing <br />the latest published annual Deflator by the Deflator f.or the <br />previous year. The result is the inflation factor. The adjusted <br />closure cost estimate shall equal the latest closure cost esti- <br />mate (see Item l(b)) times the inflation factor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.