Laserfiche WebLink
ARCADIS Table of Contents <br /> 1. Introduction 1 <br /> 2. Extraction Well Installation Activities 1 <br /> 2.1 Pre-Field Activities 1 <br /> 2.2 Field Activities 2 <br /> 2.2.1 Well Installation 3 <br /> 2.2.2 Well Development 4 <br /> 2.2.3 Well Replacement and Abandonment 4 <br /> 2.2.4 Well Survey 6 <br /> 2.2.5 Groundwater Sampling 6 <br /> 2.3 Investigation-Derived Waste Management 7 <br /> 2.4 Summary and Next Steps 7 <br /> 3. Injection Well Conversion 7 <br /> 4. Injection Well Installation Work Plan 8 <br /> 4.1 Pre-Field Activities 8 <br /> 4.1.1 Underground Utility Clearance 8 <br /> 4.1.2 Security Measures 9 <br /> 4.1.3 Permits and Property Access 9 <br /> 4.2 Well Installation 9 <br /> 4.2.1 Filter Pack Installation and Grouting 10 <br /> 4.2.2 Well Development 10 <br /> 4.3 Well Survey and Sampling 10 <br /> 4.4 Investigation-Derived Waste Management 11 <br /> 5. Schedule and Reporting 11 <br /> 6. References 11 <br /> Tables <br /> 1 Extraction Well Completion Details <br /> 2 Groundwater Sample Analytical Results—Extraction Wells <br /> lelhr pwell in518llet report_(inel_(04-2913).d— <br />