My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 2 FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 2 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:29:55 PM
Creation date
5/26/2020 1:27:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 2 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> EXTRACTION WELL COMPLETION DETAILS <br /> FORMER OCC-LATHROP FACILITY <br /> LATHROP,CALIFORNIA <br /> Reference Screen Nominal Screen Screen Slot Pump Intake Aquifer <br /> Well Elevation Total Depth Interval Diameter Size Screen Depth Intervals <br /> Name feet amsl feet b s /eet b s inches inches Material feet bgs) Screened Notes Current Status <br /> Former OCC Lathrop Facility Extraction Wells <br /> EW-01 21.40 220 135-210 10 0.070 Stainless steel — I,D — Out of Service <br /> EW-02 19.00 220 150-210 10 0.070 Stainless Steel 185 D — Operating under treatment system <br /> optimization program <br /> EW-03 17.43 210 60-94 10 0.070 Stainless Steel -- S,I,D Packer pushed to 185 it bgs and well Being converted to injection well <br /> 134-200 redeveloped December 2012 <br /> EW-04 16.00 200 105-125 8 0.070 Stainless Steel 123 I,D Well redeveloped and rehabilitated Off-line,not suitable for injection <br /> 170-190 previous screening interval 70-103 <br /> EW-04A 17.31 218 158-213 8 0.035 Stainless Steel 145 D _ Operating under treatment system <br /> optimization program <br /> EW-05 12.37 170 70-160 8 0.070 Stainless Steel 105 S,I,D — Off-line <br /> 120-150 Well redeveloped and rehabilitated, <br /> EW-06 19.58 210 6 0.035 Stainless Steel 123 I,D previous screening interval 90-100 Operating under treatment system <br /> 160-210 feet bgs sealed by swedging optimization program <br /> EW-07 18.25 206 136- 206 8 0.035 Stainless Steel 100 I,D New pump/motor installed April 2011 Off-line <br /> 70-100 Operating under treatment system <br /> EW-8A 18.34 136 6 0.020 PVC 117 S. Well installed in August 2008 <br /> 115-130 optimization program <br /> EW-86 18.55 208 159-199 6 0.020 PVC 181 D Well installed in August 2008 Operating under treatment system <br /> optimization program <br /> EW-09 22.26 40 1040 6 0.010 Stainless steel — WT Well installed December 21,2011 Operating under treatment system <br /> optimization program <br /> EW-10 NA 45 1040 6 0.010 Stainless steel NA WT Well installed January 30,2013 Currently awaiting connection to the <br /> treatments stem and startup <br /> EW-11 NA 45 10-40 6 0.010 Stainless steel NA WT Well installed January 30,2013 Currently awaiting connection to the <br /> treatments stem and startup <br /> EW-12A NA 155 70-100 6 0.010 Stainless steel NA S,I Well installed January 25,2013 Currently awaiting connection to the <br /> 120-150 treatments stem and startu <br /> EW-12B(R) NA 185 150-180 6 0.010 Stainless steel NA D Well installed March 8,2013 Currently awaiting connection to the <br /> treatments stem and startup <br /> EW-13 NA 155 120-150 6 0.010 Stainless steel NA I Well Installed January 23,2013 Currently awaiting connection to the <br /> treatments stem and startup <br /> EW-14A NA 155 70-100 6 0.010 Stainless steel NA S,I Well Installed January 17,2013 Currently awaiting connection to the <br /> 120-150 treatments stem and startup <br /> EW-14B NA 205 170-200 6 0.010 Stainless steel NA D Well Installed January 1B,2013 Currently awaiting connection to the <br /> treatments stem and startup <br /> EW-15A NA 155 70-100 6 0.010 Stainless steel NA S,I Well installed January 17,2013 Currently awaiting connection to the <br /> 120-150 treatments stem and startup <br /> EW-15B NA 205 170-200 6 0.010 Stainless steel NA D Well installed January 19,2013 Currently awaiting connection to the <br /> treatments stem and startup <br /> EW-17 NA 45 1040 6 0.010 Stainless steel NA WT Well Installed January 29,2013 Currently awaiting connection to the <br /> treatments stem and startup <br /> Notes <br /> Treatment system optimization began April 19.2011. <br /> WT-Water Table,S-Shallow,I-Intermediate;D-Deep <br /> --not applicable/not available <br /> PVC-polyvinyl chloride <br /> Water Table zone is 0-50 feet bgs <br /> Shallow zone is 50-100 feet bgs <br /> Intermediate zone is 100-150 feet bgs <br /> Deep zone is 150-250 feet bgs <br /> NA-Not available(well awaitng survey and pump installation) <br /> Table 1-EW delails.ds ARCADIS Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.