Laserfiche WebLink
GEOMATRIX <br /> The pumping phase of the step-drawdown test will consist of: (1)pumping the well at succes- <br /> sively higher pumping rates(steps)specified by the responsible professional,with an approxi- <br /> mate duration of two to four hours per step; (2)periodically and at similar times measuring the <br /> water levels in the pumped well and observation wells during each step; (3)measuring the <br /> instantaneous and cumulative discharge from the pumped well using a flow meter or other <br /> appropriate means; and(4)recording the time at which all measurements were taken. <br /> The pumping rate for each step will be maintained relatively constant. The rate will be checked <br /> periodically(at least hourly) and adjusted if necessary. The accuracy of the flow meter also <br /> may be verified periodically using the sweep needle on the flow meter,if available, and a stop- <br /> watch. The accuracy of the flow meter will be checked using a container of known volume and <br /> a stopwatch. <br /> The recovery phase of the step-drawdown test begins immediately after the pump is shut off at <br /> the completion of the final step of the pumping phase. Recovery water-level measurements <br /> will be made periodically in the pumped well and observation wells. Water level measure- <br /> ments will conclude when one of the following is satisfied: (1)the water level in the pumped <br /> well has recovered to pre-test level, (2)the water level in the pumped well has remained con- <br /> stant for at least 2 hours; or(3)24 hours has elapsed since the time of pump shut-off. <br /> 3.0 CONSTANT DISCHARGE TEST <br /> During the pretest phase,water level measurements will be taken in the pumped well and all <br /> observation wells that are to be monitored throughout the duration of the test. Water level <br /> measurements will be taken with electric sounders,pressure transducers with a data-logger, or <br /> a steel tape. All pretest water level measurements for the pumping well and observation wells <br /> will be recorded for the appropriate well. <br /> 3.1 PUMPING PHASE <br /> During the pumping phase of the aquifer test,the following measurements will be made: <br /> (1)water levels in the pumped well and the observation wells; (2)instantaneous and <br /> cumulative discharge from the pumped well; and(3)time at which measurements are taken. <br /> The duration of the pumping phase will be established prior to the start of the aquifer test. <br /> Time-drawdown curves for the observation wells may be plotted in the field on semi-logarith- <br /> mic graph paper during the pumping phase to evaluate the progress of the test. If the plots indi- <br /> L'\Doc Safe\PROTOCOL\PROTO-AQ 0802.dm AQUIFER TESTING <br /> REVISION DATE: March 19% Page 2 of 5 <br />