My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
50
>
2900 - Site Mitigation Program
>
PR0506382
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 4:00:00 PM
Creation date
5/26/2020 3:26:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506382
PE
2950
FACILITY_ID
FA0007381
FACILITY_NAME
LODI RAIL/MULFIMODAL STATION
STREET_NUMBER
50
Direction
S
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95241
APN
04303707
CURRENT_STATUS
02
SITE_LOCATION
50 S SACRAMENTO ST
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II Site Assessment Workplan/Health and Safety Plan October 1996 <br /> for the Lodi Rail/Multimodal Station Project No. E168-1 <br /> SITE SPECIFIC HEALTH & SAFETY PLAN <br /> Lodi Rail/Multimodal Station <br /> This form must be completed in a minimum of one (1) week prior to the start of work. It is <br /> the responsibility of the project engineer to complete all items. All project personnel must <br /> receive a copy of this form and familiarize themselves with its contents prior to the start of <br /> activities. <br /> 1. Site Name and Address: <br /> Lodi Rail/Multimodal Station Site <br /> Approximately 50 South Sacramento Street to 28 North Sacramento Street, <br /> Lodi, CA <br /> The Site is bounded by East Elm St. on the north, Southern Pacific Railroad on the east, East <br /> Oak St. on the south, and North and South Sacramento Street on the West (See Figure 1). <br /> 2. Site Personnel: <br /> Project Manager Carlos Espana <br /> Project Engineer/Geologist Patrick Fischer <br /> Stephen Harvey <br /> Driller <br /> Helper <br /> 3. Site Description and Background <br /> See Site Workplan <br /> 4. List of Potential Chemical Contaminants: <br /> Contaminant Source Medium Anticipated <br /> Concentrations <br /> Fuel (gas/diesel) UST/Pipelines Soil/Air Unknown <br /> Waste oil Sumps/dumping Soil Unknown <br /> Solvents Sumps/dumping Soil/Air Unknown <br /> 1 <br /> V ESPANA GEOTECHNICAL CONSULTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.