My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CROMWELL
>
807
>
1900 - Hazardous Materials Program
>
PR0529890
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 10:11:56 AM
Creation date
5/26/2020 5:13:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0529890
PE
1921
FACILITY_ID
FA0019727
FACILITY_NAME
AMERICAN RIVER AG
STREET_NUMBER
807
STREET_NAME
CROMWELL
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
807 CROMWELL AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Robert Lopez [EHD] <br /> From: John Conboy <John@americanriverag.com> <br /> Sent: Thursday,July 2, 2020 1:08 PM <br /> To: Robert Lopez [EHD] <br /> Subject: RE: PR0529890; American River Ag - 807 Cromwell Ave, Stockton; Compliance Review <br /> Attachments: CERS Submittal 807 7.2.2020.pdf <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Hi Robert, <br /> These items have been corrected and resubmitted. I believe I did it correctly. <br /> Let me know if you need anything else. <br /> Best, <br /> John <br /> From: Robert Lopez [EHD] <rlopez@sjgov.org> <br /> Sent: Friday,June 26, 2020 9:32 AM <br /> To:John Conboy<John@americanriverag.com> <br /> Subject: PR0529890; American River Ag-807 Cromwell Ave,Stockton; Compliance Review <br /> Mr. Conboy, <br /> I have reviewed the CERS submittal of June 17, 2020 and have found the following issues: <br /> • Violation #5,the hazardous materials inventory is not complete. <br /> 1. Petroleum oil—the five 55 gallon drums have not been reported. <br /> 2. Grease—the maximum daily amount was wrongly reported as 275 vs. 330 gallons and the size of the <br /> largest container, average daily amount, and days on site elements have not been completed. <br /> • Violation #6,the site map does not show or address the following: <br /> 1. Internal roads(none). <br /> 2. Adjacent streets (the adjacent street, Cromwell Ave. has not been identified). <br /> 3. Each handling and storage area for the oil and the grease are not shown. <br /> 4. Access and exit points for the structure are not shown. <br /> A site map shall contain a north orientation, loading areas, internal roads, adjacent streets, storm and sewer drains, <br /> access and exit points, emergency shutoffs, evacuation staging areas, hazardous material handling and storage areas, <br /> and emergency response equipment. If a site map element is not applicable for your facility then list it on the map and <br /> label as "NA". <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.