Laserfiche WebLink
B . If the project will use significant amounts of any of the <br /> following , estimate amount or note that a large amount will be <br /> consumed : <br /> a . water + 50 , 000 GPD C . natural gas Median Amount <br /> b. electricity Median Amount <br /> 9 . Describe any discharges into surface waters ( including intermit- <br /> tant streams ) None <br /> 10 . Will the project result in substantial air emissions or <br /> deterioration of ambient air quality? NO YES <br /> 11 . Will there be objectionable odors? x NO __YES <br /> 12 . Describe any alteration of air movements , moisture , or tem- <br /> perature , or any change in climate, either locally or <br /> regionally N/A <br /> 13 . Specify any hazardous materials which will require storage , <br /> disposal , or transportation N/A <br /> 14 . Describe any exposure of people to noise , hazardous materials or <br /> situations N/A <br /> 15 . Describe any displacement of people as a result of the project <br /> N A <br /> 16 . Describe any congestion which might occur on roadways or at <br /> interchanges or intersections as a result of the project <br /> Hammer Lane, U . S . Frontage Road , U .S . 99 / Hammer Lane Interchange <br /> will receive increased traffic caused by our project <br /> B. MITIGATION MEASURES <br /> If any environmental impacts were described in the previous section , <br /> list and describe measures proposed to minimize the impacts . (Attach <br /> additional pages , if necessary. Use the following format . ) <br /> l .- Impact Increased Traffic-Hammer Lane .(See' Traffic. Studv) <br /> be widened as required to accommodate our project. <br /> Mitigation Measures Widened Hammer Lane (See Traffic Study) <br /> as required by the County to accommodate our project. <br /> -7- ( 9/85 ) <br /> Plan-4114 <br />