My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PEPSI
>
4276
>
2900 - Site Mitigation Program
>
PR0545649
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 10:13:43 AM
Creation date
5/27/2020 9:53:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545649
PE
2965
FACILITY_ID
FA0025877
FACILITY_NAME
COUNTY SERVICE AREA 15
STREET_NUMBER
4276
Direction
E
STREET_NAME
PEPSI
STREET_TYPE
PL
City
STOCKTON
Zip
95215
APN
08710058
CURRENT_STATUS
02
SITE_LOCATION
4276 E PEPSI PL
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• h l• r >aRf 1 <br /> SAN JOAQUIN COUNTY IMPROVEMENT DISTRICT NO. <br /> IYATERLOO-99 SEWER ASSESSMENT DISTRICT <br /> ENGINEER'S ESTIMATE 01- CONSTRUCTION COST <br /> 12" V.C .P. 4670 L.F. 0 12.00 5690.10.00 <br /> 8" V.C .P. 1420 L.F. 0 8.00 11 ,360.00 <br /> 6" V.C .P. 1270 L.F. 0 7.00 8,890.00 <br /> 12" V.C .P. (Waterloo Rd. , Bore, 120 L.F. 0 150.00 189000.00 <br /> case and jack) <br /> M .Ii. 23 EA. 0 700.00 169100.00 <br /> L.H. 2 EA. 0 200.00 400.00 <br /> LATERALS 30 EA. 0 200.00 6,000.00 <br /> LIFT STATION LUMP SUM 25,000.00 <br /> SEWAGE TREATMENT PLANT LUAU' •SUM 25 ,000.00 <br /> POND CONSTRUCTION 11UNIP SUM 290 1000.00 <br /> PAVEMENT PATCHING LUAU' SUM 5 ,000.00 <br /> Subtotal 1919790.00 <br /> 8" V.C .P. 995 L. F. 0 8.00 ', 4)60.00 <br /> N1.II. 3 EA . 0 700.00 2, 100.00 <br /> L.Ii. l EA. GD 200.00 200.00 <br /> LATERALS 7 EA. 0 200.00 1 , 400.00 <br /> Subtotal 11 ,660.00 <br /> Total Estimated Construction Cost $ 203 , 450.00 <br /> OTHER COSTS <br /> ESTIMATED CONTINGENCIES 229136.00 <br /> BOND DISCOUNT 5% x 275 ,000 139750 .00 <br /> ENGINEERING 12% x 2030450 249214 .00 <br /> LEGAL FEES 3% x 275,000 8,250.00 <br /> PRINTING 3,000.00 <br /> TOTAL $ 2759000.00 <br /> SAN JUA��UIN <br /> CANNI N4 DEpARTM V T y <br /> P <br /> ENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.