Laserfiche WebLink
• h l• r >aRf 1 <br /> SAN JOAQUIN COUNTY IMPROVEMENT DISTRICT NO. <br /> IYATERLOO-99 SEWER ASSESSMENT DISTRICT <br /> ENGINEER'S ESTIMATE 01- CONSTRUCTION COST <br /> 12" V.C .P. 4670 L.F. 0 12.00 5690.10.00 <br /> 8" V.C .P. 1420 L.F. 0 8.00 11 ,360.00 <br /> 6" V.C .P. 1270 L.F. 0 7.00 8,890.00 <br /> 12" V.C .P. (Waterloo Rd. , Bore, 120 L.F. 0 150.00 189000.00 <br /> case and jack) <br /> M .Ii. 23 EA. 0 700.00 169100.00 <br /> L.H. 2 EA. 0 200.00 400.00 <br /> LATERALS 30 EA. 0 200.00 6,000.00 <br /> LIFT STATION LUMP SUM 25,000.00 <br /> SEWAGE TREATMENT PLANT LUAU' •SUM 25 ,000.00 <br /> POND CONSTRUCTION 11UNIP SUM 290 1000.00 <br /> PAVEMENT PATCHING LUAU' SUM 5 ,000.00 <br /> Subtotal 1919790.00 <br /> 8" V.C .P. 995 L. F. 0 8.00 ', 4)60.00 <br /> N1.II. 3 EA . 0 700.00 2, 100.00 <br /> L.Ii. l EA. GD 200.00 200.00 <br /> LATERALS 7 EA. 0 200.00 1 , 400.00 <br /> Subtotal 11 ,660.00 <br /> Total Estimated Construction Cost $ 203 , 450.00 <br /> OTHER COSTS <br /> ESTIMATED CONTINGENCIES 229136.00 <br /> BOND DISCOUNT 5% x 275 ,000 139750 .00 <br /> ENGINEERING 12% x 2030450 249214 .00 <br /> LEGAL FEES 3% x 275,000 8,250.00 <br /> PRINTING 3,000.00 <br /> TOTAL $ 2759000.00 <br /> SAN JUA��UIN <br /> CANNI N4 DEpARTM V T y <br /> P <br /> ENT <br />