My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIERRA NEVADA
>
1145
>
3500 - Local Oversight Program
>
PR0545691
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 12:00:27 PM
Creation date
5/27/2020 11:53:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545691
PE
3528
FACILITY_ID
FA0004068
FACILITY_NAME
GBM Manufacturing Inc.
STREET_NUMBER
1145
Direction
S
STREET_NAME
SIERRA NEVADA
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15135027
CURRENT_STATUS
02
SITE_LOCATION
1145 S SIERRA NEVADA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d' <br /> CHRONOLOGY <br /> - ANGELICA TEXTILE <br /> 1145 S. SIERRA NEVADA ::IST. <br /> STOCKTON CA 95205 <br /> 02/11/03 One 12,000 gallon diesel underground storage tank removed this date <br /> under permit and inspection by SJC/EHD. Soil samples for analysis were <br /> collected from the tank pit, dispenser area and soil stockpiles <br /> 03/03/03 Report of analytical results documented contamination only in the sample <br /> from the dispenser area, at 2-feet bsg, of 6;!100 ppm TPH as diesel and' <br /> 0.008 ppm total xylenes. <br /> 08/05/03 Unauthorized Release Report#03-U17 and Prop 65#03-048 submitted <br /> this date. <br /> 11/25/03 Notice of Responsibility letter sent to Angelica Textile. A directive to <br /> submit a work plan to investigate the contamination at the dispenser was <br /> included, with a submittal deadline of January 15, 2004. <br /> 02/04/04 Work plan submitted this date by Advanced GeoEnvironmental, Inc.. <br /> 02/13/04 SJC/EHD work plan approval letter sent this date. <br /> 04/08/04 Fieldwork began this date for work plan implementation. .One soil <br /> boring, one water sample collected. <br /> 04/16/04 Fieldwork completed this date. Second soil boring, second water <br /> sample and three soil samples collected. <br /> 08/06/04 Report of Findings submitted to SJC/EHD'this date. All reported <br /> analytical results are non-detect. Report recommends no further <br /> action be required at the site. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.