My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIERRA NEVADA
>
1145
>
3500 - Local Oversight Program
>
PR0545691
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 12:00:27 PM
Creation date
5/27/2020 11:53:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545691
PE
3528
FACILITY_ID
FA0004068
FACILITY_NAME
GBM Manufacturing Inc.
STREET_NUMBER
1145
Direction
S
STREET_NAME
SIERRA NEVADA
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15135027
CURRENT_STATUS
02
SITE_LOCATION
1145 S SIERRA NEVADA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tft <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> OPpU[!V - SAN JOAQUIN COUNTY - <br /> ".p Unit Supervisors <br /> G <br /> Floorman R.E.H.S. <br /> Donna K.Heran,R.E.H.S. Carl Borgvenue, Third <br /> Director <br /> 304 East Web . Mike Huggins,R.E.H.S.,R.D.l. <br /> Weber A <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> • :. �- 'P• Fax: (209)Program Manager Telephone: (209) 468=3420 Margaret Lagorio,R.E.H.S. <br /> �/ <br /> ..FOR Laurie A.Cotulla,R.E.H.S. 464-0138Robert McClellon,R.E.H.S. <br /> - - <br /> Program Manager Mark Barcellos,R.E.H.S. <br /> STEVE SANCHEZ FEB 13 2004 . <br /> ANGELICA TEXTILES <br /> 1145 SIERRA NEVADA <br /> STOCKTON CA 95205 <br /> i <br /> Site Code: # 1545 <br /> RE: Angelica Textiles <br /> 1145 Sierra Nevada <br /> Stockton CA 95205 <br /> WORK PLAN: `Preliminag Site Assessment Work Plan" ' <br /> DATED: February 4,2004 <br /> PREPARED BY: Advanced GeoEnvironmental,Inc. <br /> APPROVED: [x] <br /> DISAPPROVED:L ] <br /> ADE UATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25299.37,subd(c)(3)1: <br /> 1.Advancement of one direct push soil boring for the collection of grab soil and groundwater samples. <br /> 2.Collected samples will be analyzed by EPA-approved methods for BTEX and TPH diesel. <br /> 3.If contamination is noted in the samples,further borings will be completed to assess its vertical and lateral extent. <br /> I <br /> COMMENTS AND CONDITIONS: <br /> 1.SJC/EHD boring permit has been issued to complete the outlined work. <br /> o all fieldwork. <br /> 2.Forty-eight hours notice to SJC/EHD is required prior t <br /> 3.A report of findings must be submitted to SJC/EHD within 60 days following completion of all fieldwork. <br /> Nuel C.Henderson,Jr.,R. <br /> Lori Duncan,Senior RENS. LOP/Site Mitigation Unit IV <br /> LOP/Site Mitigation Unit IV <br /> cc: James Barton,CVRWQCB <br /> Eyrene Fisher,AGE <br /> i <br /> I � <br />
The URL can be used to link to this page
Your browser does not support the video tag.