Laserfiche WebLink
J . <br /> Christopher M. Palmer, PG, CEG, HG, Consulting Hydrogeologist <br /> 1345 Kimberly Drive San Jose,CA 95118 ph.408/267-5238;fax 408/267-7396 <br /> CMPRGCEGHG@aol.com <br /> January 10, 2012 <br /> �r �• i I <br /> Project No. 188.02s <br /> JAN 14 Zdt3 <br /> Mr. Paul Verma <br /> City of Tracy Cfi/QI;TFr�C <br /> 325 Civic Center Drive D.E.So <br /> Tracy, CA 95376 <br /> Re.: Monitoring Well Destruction Workplan for City of Tracy Delta <br /> Disposal Site, 99 West 61h Street Tracy, CA <br /> Dear Mr. Verma, <br /> Christopher M. Palmer, Consulting Hydrogeologist (CMP) has prepared this <br /> Monitoring Well Destruction Workplan for the Delta Disposal site at 99 6L' Street, <br /> Tracy (Figure 1). This site received a "no further action" letter from the San <br /> Joaquin County Environmental Health Department (EHD) in August 2012. The <br /> EHD will issue a Case Closure Letter once the existing monitoring wells have <br /> been properly destroyed and all onsite waste materials have been removed and <br /> properly disposed. <br /> This workplan has been prepared on behalf of the City of Tracy (City) and <br /> contains an outline of the proposed well destruction method. Wright <br /> Environmental Services, Inc. boring logs, monitoring well construction well <br /> details, and maps illustrating monitoring well locations are attached. Once the <br /> EHD has reviewed and approved the workplan the City will select the contractor <br /> for the well destruction and submit well destruction permits to EHD. The City will <br /> directly contract the qualified C-57 well drilling contractor to pthe work. <br /> The City is responsible for all well destruction drilling waste r and proper <br /> disposal. <br /> Please note that the EHD may amend the act 91 r4, i n cedure that <br /> the well driller must follow per their approved rm = H iffcations to well <br /> destruction procedures may occur in the fi :;d th etc X11 destruction work. <br /> Monitoring Well Destruction A roach <br /> There are three monitoring w is at the D sposal site at the locations shown <br /> on Figure 2. The explora ung I s d monitoring well construction details <br /> for each well are ais a c e <br /> Page 1 of 3 <br />