Laserfiche WebLink
king Underground Fuel Storage Tank Pre •n <br /> III. Release and Site Characterization Information continued <br /> Maximum Documented Contaminant Concentrations-- Before and After Cleanup <br /> Contaminant Soil Before (ppm) Water (ppm) Contaminant Soil Before (ppm) Water (ppm) <br /> After Before After After Before After <br /> TPH(Gas) 740 NA 34 <0.050 Xylenes 17 NA 1.6 <0.0005 <br /> TPH(Diesel) 18,000 NA 750 <0.050 Ethylbenzene 0.27 NA <0.0025 <0.0005 <br /> Benzene <0.005 NA <0.0025 <0.0005 TPHmo NA NA NA NA <br /> Toluene <0.005 NA <0.0025 <0.0005 Lead <0.5 NA NA NA <br /> 1-2 DCA <0.005 NA <0.0025 <0.0005 MTBE <0.005 NA <0.0025 <0.0005 <br /> Comments: Soil 'Before' TPHg; B3-3@16' on 2/5/03, TPHd;1 East @ 8' on 5/14/90, Benzene; 1 West @ 8' on 5/14/90, <br /> Toluene; 63-3 CD. 16'on 2/5/03, 1,2 DCA from B-3-3 @ 16', Xylenes; B-3-3 @ 16' on 2/5/03, Ethylbenzene; 1 East @ 8'on <br /> 5/14/90, Lead; 1 West @ 8' on 5/14/90, MTBE; 63-3 @ 16' on 2/5/03. No data for Soil 'After', TPHmo not analyzed for soil <br /> before. Water'13efore' is from B-3 on 2/5/03 depth unknown for TPHg, TPHd, Benzene, Toluene, 1-2 DCA, Xylenes, <br /> Ethylbenzene. No Water'Before'for Lead. Water'After'from MW-2 on 8/10/09 for TPHg, TPHd, Benzene, Toluene, 1-2 <br /> DCA, X lenes, E--th (benzene, and MTBE. No Water&Soil 'After'for Lead. <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan?Yes <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan? Yes <br /> Does corrective action protect public health for current land use? Yes <br /> Site management requirements: None <br /> Should corrective action be reviewed if land-use changes?Yes <br /> Monitoring/Vapor wells decommissioned: Yes Number Decommissioned: 3 Number retained: 0 <br /> List enforcement actions taken: Notice of Responsibility: 1/21/98, 2/2/98 <br /> List enforcement actions rescinded: None <br /> V. Local Agency Representative Data <br /> Name: DONN,4, RERAN, REHS Title: DIRECTOR <br /> Signature: Date: <br /> VI. Central Valley Regional Water Quality Control Board RB Notification <br /> Date Submitted to RB: August 27, 2012 Response Date: September 18, 2012 <br /> RB Staff: JAMES L.L. BARTON, PG Response: <br /> Title: ENGINEERING GEOLOGIST <br /> VII. Additional Comments, Data, etc. <br /> This document and the related CASE CLOSURE LETTER shall be retained by the lead agency as part of the official site file. <br /> Page 2 <br />