My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012625
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
ARCHIVED REPORTS_XR0012625
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 1:31:17 PM
Creation date
5/27/2020 12:25:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012625
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> March 9, 1.988 AGS 038009-1 <br /> f" Fire Engine Company No. 2, Stockton, California <br /> 6� -- <br /> The soil, borings will be drilled to a depth approximately 20 feet <br /> below the upper zone of saturation, or 5 feet into any saturated <br /> clay layer (aquitard) encountered. If an aquitard is <br /> encountered, the borings will be terminated and backfilled with 5 <br /> feet of neat cement before installing ground-water monitoring <br /> wells. <br /> All drill cuttings generated during drilling will be left at the <br /> site. Disposal of the soil remains the responsibility of the <br /> Department of Public Works, City of Stockton. Applied Geosystem_ <br /> can arrange to have the soil treated or -removed to an appropriate <br /> disposal facility with prior authorization by that agency. <br /> Applied GeoSystems will contact Underground Services Alert (USA) <br /> to delineate pnblie utility lines at the site before we begin <br /> drilling. The Department of Public Works will have a <br /> representative present on site to advise or confirm the location <br /> of soil borings with respect to underground utilities and other <br /> structures. <br /> 1� <br /> 11 <br /> `� A0,011e0f GenSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.