Laserfiche WebLink
TABLES <br /> I <br /> ® 1. SUMMARY OF WELL DATA FOR THE AREA AROUND SUBJECT SITE <br /> 2 LABORATORY METHODS <br /> 3 PURPOSE OF SOIL BORINGS <br /> 4 SUMMARY OF SOIL BORINGS <br /> 5 SUMMARY OF MONITORING WELL CONSTRUCTION <br /> b ELEVATION OF GROUNDWATER SURFACE <br /> 7 EVALUATED GROUNDWATER GRADIENTS AND DIRECTION OF GROUND- <br /> WATER FLOW <br /> 8 CONCENTRATIONS OF HYDROCARBONS IN SOIL SAMPLES <br /> 9 RESULTS OF SUBJECTIVE ANALYSES <br /> ® 10 CONCENTRATIONS OF HYDROCARBONS IN WATER SAMPLES <br /> 11 PURPOSE OF SOIL BORINGS AND MONITORING WELLS AND RESULTS OF <br /> INVESTIGATION <br /> PLATES <br /> 1 SITE VICINITY MAP <br /> 2 GENERALIZED ,SITE PLAN <br /> 3 UNIFIED SOIL C1-ASSIFICAT ON SYSTEM <br /> 4 - 20 BORING LOGS <br /> 21 NORTHERN SITE DETAIL <br /> 22 CROSS SECTION A - A' <br /> 23 CROSS SECTION B - B' <br /> 24A-24C GROUNDWATER SURFACE MAPS DECEMBER 1988 TO MARCH 1990 <br /> 2SA-25D GROUND-WATER SURFACE MAPS MAY TO JULY 1990 <br /> 26 MAP OF TOTAL PETROLEUM HYDROCARBON CONCENTRATION IN <br /> GROUND WATER <br /> 27 MAP OF BENZENE CONCENTRATION IN GROUND WATER <br />