Laserfiche WebLink
FIELD PROCEDURES <br /> Site Safety Plan <br /> This plan describes the safety requirements for field work performed at the site The site safety <br /> plan is applicable to personnel of Smith Technology Corporation who perform the field work A <br /> copy of the site safety plan is available for reference by appropriate parties during the work The <br /> on site representative of Smith Technology acts as the Site Safety Officer <br /> Groundwater Well Purging and Sampling <br /> The static water level in each well was measured to the nearest 0 01 foot with a Solinst electric <br /> water-level sounder cleaned with a laboratory-grade, non-phosphatic detergent and deiomzed <br /> water before use in each well A clean bailer was used to obtain a sample from the surface of the <br /> water in the well for subjective analysis of hydrocarbons The sample was retrieved and visually <br /> examined for floating product, sheen, color, and clarity <br /> Approximately 3 well volumes of groundwater were purged from the wells using dedicated bailers <br /> or pump systems All downhole equipment such as pumps, cables, and hoses were cleaned with a <br /> laboratory-grade, non-phosphatic detergent and water before use in each well The wells were <br /> purged until withdrawal was of sufficient duration to result in stabilized pH, temperature, and <br /> electrical conductivity of the water, as measured by portable meters calibrated to a standard buffer <br /> and conductivity standard The wells were allowed to recover to at least 80 percent of the static <br /> water level prior to sampling The groundwater purged from the wells was discharged under <br /> permit to the City of Stockton sanitary sewer by Alex Flores <br /> A sample of the formation water then was collected from the surface of the water in each of the <br /> wells with dedicated disposable bailers and slowly transferred to laboratory-cleaned sample <br /> containers <br /> Evaluation of Groundwater Gradient <br /> The elevation of the top of each well casing was measured by Smith Technology using well MW- <br /> 4 as the datum point The U S G S Quadrangle Map, Stockton West, California 1976, was used <br /> to evaluate the elevation of the ground surface around well MW-4 The tops of the monitoring <br /> and recovery wells were surveyed relative to mean sea level on September 9, 1992 The elevation <br /> of the well casing and the depth to groundwater measured to each monitoring well were combined <br /> to evaluate the relative elevation of the groundwater surface in each well and the slope of the <br /> groundwater surface across the site <br />