Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME PROJECT NUMBER '1'4-3(07 WELL NO <br /> PROJECT MANAGER TYPE OF WELL ✓ Monitoring Extraction Other <br /> RECORDED BY 7(i r SAMPLED BY $-f-7 DATE 64105'9 7 <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well C g Diameter _ <br /> Wet <br /> flinch Other L/Bailer - Type t&FL-f- <br /> Well Total Depth 53 $3 feet below Top of Casing TD Pump - Type <br /> Other - Specify <br /> Depth to Water a,4,-7/ feet below To of Casing,WL <br /> P P 9 Hydrocarbon Odors <br /> Water Column Length A'a`I --feet Yes No <br /> Purge Volume Calculation (Water Column Length x Multiplier x No ``Volumes = Calculated Purge Volume) <br /> 2-9 , \v X X = 1 9 <br /> Calculated Purge Volume = j"� '� gallons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume = ---gallons <br /> Mult her Casincj Diameter inches = Gallons/linear foot 2=017 4=066 5=15 8=26 <br /> Groundwater Parameter Measurement Meter Typ t SCO Calibrated V Yes No <br /> TIME ELAPSED FLOWRATE DTW PH EC TE TURBIDITY REDOX COMMENTS <br /> TIME (OPK (ft) anhostem e G (NTU) mV tt <br /> deg F (� ,i <br /> 71 „ < / cam 2_2 tJ A ,"rQyd <br /> 12-4 9 ---- L o 77 S t" V <br /> 7 0 SSD 2� 4 E <br /> �)C 2-s-,23 Q� 2 `"4 c5 <br /> SMTH <br />