Laserfiche WebLink
r GROUNDWATER SAMPLING FORM <br /> 81"H PROJECT NAME. �i(CJ�1 51Z6,5iy4L WELL ND 141^3 <br /> s frk, PROJECT NUMBER: 94-367 TYPE✓Monitor_Extraction _Other <br /> *RECORDED BY A-i= SAMPLED BY -A"F DATE /0-el/q�_7 <br /> WELL PURGING <br /> PURGE VOLUME PURGE METHOD <br /> Wep CaurW Deamter Bader-Type <br /> 22. t, __4-w4h _other �7 Pump-Type <br /> fro ft <br /> WIN Total Depth fbelow TOCI S� l / _Other-Specify <br /> Depth to Water(WL. It below TOCi zq's9, Hydrocarbon 2Odar: <br /> _YES _j_/<0Water Column Length .�^� I1 <br /> No of Wells to be Purged 3 10 Other <br /> Purge Volume CalCUIatlan(water C l rrer Logdr:NiukRAw a No Vale . cakLmlatsd Purge vokwnal <br /> -15' �'t X 01 Oce X _ZS = 12- �5 Calculated Purge Volume <br /> (WCL) (Multlpl. (No. Vols) Actual Purge Volume = �i0 gis <br /> Multiplier IC*Sing bin Onchesl = CWonalllneat ftl 2=0.T7 4-066 6=1S U=26 <br /> Groundwater Parameter Measurement. Meter Type CSO Calibrated es No <br /> TIMEIGALLONS DTW pH CONDUC TE3VIP TURBIDITY COMMENTS <br /> (ft) TNS dot, c (NTU) (COLORIODOR) <br /> awnir"lcrn deo F <br /> -7r 0I -5�� <br /> 3q. (.o Erg -72-0 ia�r `{ !� 1 + <br /> r <br /> �s1c 6 (9 1 `330 1 atg I <br /> oiL 35,C 22 <br /> 99, jt <br /> 1 <br />