Laserfiche WebLink
06 February 2003 <br /> S AGE-NC Project No 01-0827 <br /> Page 4 of 4 <br />' Continue operation of the soil vapor extraction/air sparging system, the air-sparing network <br /> pressure at well MW-1/VW-2d should be increased to optimized in-situ hydrocarbon <br /> destruction <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br />' points(ground water samples)and subsurface conditions may vary away from these data points No <br /> other warranty, expressed or implied, is made as to the professional opinions, findings and <br /> recommendations contained in this report <br /> I <br /> I� <br /> I <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> I <br />' Advanced GeoEnvironmental,Inc <br /> 1 <br />