My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010275
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
ARCHIVED REPORTS_XR0010275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 5:03:29 PM
Creation date
5/27/2020 4:42:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010275
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07 October 2002 <br /> AGE-NC Pioject No 01-0827 <br /> Page 2 of 7 <br /> 21 SITE HYDROGEOLOGIC CONDITIONS <br /> Based upon ground water monitoring well information obtained from the site, ground water flow <br /> direction is northeasterly to easter my currently the water table occurs at a depth of approximately <br /> 25 feet bsg Gi ound water occurs in a generally sandy layer at a depth of approximately 30 feet bsg <br /> Based on cross sections on file with the EHD, the sedimentary units are thought to be relatively <br /> hoi izontal and continuous over the ai ea <br /> 3.0. SCOPE OF WORK <br /> The pi opose scope of work includes the advancement of one deep soil boring in the former UST <br /> excavation for completion of a depth-discrete ground water monitoring well In addition,grading and <br /> re-paving as part of the site re-development activities will necessitate the shutdown and tempoi ary <br /> removal of the SVEJAS systems, with re-establishment of the IAS system, AGE will also install an <br /> ozone generator with a side stream ozone infector <br /> The proposed scope of work will include the following tasks <br /> • Permitting and pre-field work preparations, <br /> • Diillmg and soil sample collection, <br /> • Monitoring well installation and development, <br /> • Re-installation of IAS and SVE systems, <br /> • Installation of ozone-sparging system, <br /> • Ground water sample collection, and <br /> • Preparation of a report of findings <br /> 3 1 PERMITTING AND PRE-FIELD WORK PREPARATIONS <br /> Applicable site assessment permits will be obtained fi om the EHD In addition, an update to the <br /> health and safety plan pi esently on-file will be pi epai ed in accordance with Occupational Safety and <br /> Health Guidance Manual forHazardous Waste Site Activities (National Institute for Occupational <br /> Safety and Health Administration, U S Coast Guard and U S Environmental Protection Agency, <br /> 1985) Prior to mobilization, each monitoring well location will be clearly marked and a utility <br /> clear ante obtained through Underground Service Alert <br /> 4dt anted GeoEnvironrncnta1 Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.