Laserfiche WebLink
A S S Q C I A T E S I N C <br /> analytical results A complete set of plans will be submitted to the City of Stockton Building, Planning <br /> and Fire Departments for review, comment, and approval prior to construction and installation of the <br /> VES and AS system An application for installation of the proposed vapor extraction and air sparge <br /> wells will be submitted to PHSIEHD Permits require the contractor's license number for the <br /> consultant/contractor who will be performing the work and therefore could not be completed by ATC • <br />' at this time <br /> 1 6_2 Construction and Construction Inspection <br /> Following approval of the design plans and specifications, obtauung City Building, Fire and Planning <br /> 1 Department permits, PHS/EHD well installation permits, and SJVUAPCD air permit to construct, <br /> systems installation in accordance with the approved Plans and Specifications will be initiated <br /> Construction will include completion of wellhead piping connections, pressure testing of lutes, <br /> 1 installation of the remediation shed,connection of electrical service and installation, and plumbing of all <br /> process equipment related to the VES and groundwater AS system <br />' 6_3 Systems Startup and Operation <br /> 6.3.1 Vapor Extraction and Air Sparge Systems Monitoring <br /> yAfter completion of installation, operation of the proposed VES and AS system will be initiated in <br /> compliance with applicable regulatory agencies Startup procedures will include monitoring, <br />' maintenance and sampling within the first 5 days of operation Operation and maintenance of the <br /> systems typically includes three site inspections for the first week of operation, and site visits once <br /> every week for the first month After the first month of operation, site visits will be typically performed <br />' once every two to four weeks, or as needed over the operating life of the remediation systems <br /> Modifications to this typical schedule will be made if additional requirements are specified by the <br /> SJVUAPCD in the Authority to Construct/Permit to Operate for this site Routine maintenance of the <br />' VES and AS system will be performed during these site visits and as follows <br /> 1 <br />' W 162574 011CAP report doc 10 <br />