My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010277
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
ARCHIVED REPORTS_XR0010277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 5:15:02 PM
Creation date
5/27/2020 4:43:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010277
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A S S Q C I A T E S I N C <br /> analytical results A complete set of plans will be submitted to the City of Stockton Building, Planning <br /> and Fire Departments for review, comment, and approval prior to construction and installation of the <br /> VES and AS system An application for installation of the proposed vapor extraction and air sparge <br /> wells will be submitted to PHSIEHD Permits require the contractor's license number for the <br /> consultant/contractor who will be performing the work and therefore could not be completed by ATC • <br />' at this time <br /> 1 6_2 Construction and Construction Inspection <br /> Following approval of the design plans and specifications, obtauung City Building, Fire and Planning <br /> 1 Department permits, PHS/EHD well installation permits, and SJVUAPCD air permit to construct, <br /> systems installation in accordance with the approved Plans and Specifications will be initiated <br /> Construction will include completion of wellhead piping connections, pressure testing of lutes, <br /> 1 installation of the remediation shed,connection of electrical service and installation, and plumbing of all <br /> process equipment related to the VES and groundwater AS system <br />' 6_3 Systems Startup and Operation <br /> 6.3.1 Vapor Extraction and Air Sparge Systems Monitoring <br /> yAfter completion of installation, operation of the proposed VES and AS system will be initiated in <br /> compliance with applicable regulatory agencies Startup procedures will include monitoring, <br />' maintenance and sampling within the first 5 days of operation Operation and maintenance of the <br /> systems typically includes three site inspections for the first week of operation, and site visits once <br /> every week for the first month After the first month of operation, site visits will be typically performed <br />' once every two to four weeks, or as needed over the operating life of the remediation systems <br /> Modifications to this typical schedule will be made if additional requirements are specified by the <br /> SJVUAPCD in the Authority to Construct/Permit to Operate for this site Routine maintenance of the <br />' VES and AS system will be performed during these site visits and as follows <br /> 1 <br />' W 162574 011CAP report doc 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.