Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> S.ttr..kk, <br /> PROJECT NAME r J— WELL NO <br /> TBp�pBE3Q7RF�1AS>;�1 PROJECT NUMBER c� 6 I V TYPE.I Monitor!Extraction Other <br /> 6"RECORDED BY >;1 f <br /> c�rrvw+- SAMPLED BY A T C,o�/'^"� DATE � r 3 �� <br /> WELL PURGING <br /> PURGE VOLUME PURGE METHOD <br /> Wag Casing Diamter _Bailer-Type <br /> 2 etch _4-m-,ch _other 'Pump-Type T <br /> Wag Total Depth(TD It below TOC) S _Other-Specify <br /> Depth to Water(WL h below TOC) , b.� Hydrocarbon Odom <br /> Y YES —NO <br /> Water Column Length <br /> No of Wells to be Purged 3 10 Other <br /> Purge Volume Calculation macer Column L&Vch a bkftp&w x No Vols - CW= atad Rage Volans) <br /> n <br /> I <br /> T-3 X .1-4 X -? _ , Calculated Purge Volume as 9 yls <br /> (WCL) (Multlpl } (No Vols) Actual Purge Volume a1-a 912 <br /> MultlpgarlCaatngDim OnchaslsiGallons)1naarft) Z=0.77 4=066 8=15 0a76 <br /> Groundwater Parameter Measurement: Meter Type a Calibrated- V Yes No <br /> TIME/GALLONS DTW pH CormUC TURBIDITY COMMENTS <br /> (ft) TIVITY de (NTU) (COLORIODOR) <br /> mmhodern <br /> ; 0 " w6 ! J9g a3 � a <br /> / j `� ? J (� S 4 1 4 vcn v dam-. z r; s <br /> 13r . <br /> 1 <br />