My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010290
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
ARCHIVED REPORTS_XR0010290
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 5:10:32 PM
Creation date
5/27/2020 4:47:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010290
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Working to Restore Nature <br /> FIELD PROCEDURES <br /> Site Safety Plan <br /> This plan describes the safety requirements for field work performed at the site The site <br /> safety plan is applicable to personnel of RESNA Industries who perform the field work A <br /> copy of the site safety plan is available for reference by appropriate parties during the work <br /> The onsite representative of RESNA Industries acts as the Site Safety Officer <br /> Drilling Soil Borings <br /> We contacted Underground Service Alert at least 48 hours before drilling to delineate <br /> public utility lines at the site Before drilling, we hand augered each borehole to 3 to 5 feet <br /> below grade A licensed well driller drilled the borings using a truck-mounted drill rig <br /> equipped with 6 25-inch, 8-inch, or 10-inch-diameter hollow-stem augers The drilling was <br /> performed under the guidance of a field geologist. During drilling, soil samples were <br /> collected at 5-foot or other appropriate intervals using a California-modified, split-spoon <br /> sampler equipped with clean brass sleeves Samples were collected by drilling the boring <br /> to a point,lust above the sampling depth and then driving the sampler into the soil through <br /> the hollow center of the auger The sampler was driven 18 inches with a standard 140- <br /> pound hammer dropped 30 inches The number of blows required to drive the sampler each <br />�t successive 6-inch interval was counted and recorded on the field boring log to give an <br /> indication of soil consistency <br /> The earth materials was logged using visual and manual methods as drilled using the <br /> Unified Soil Classification System A photoionization detector (PID) was used to evaluate <br /> soil samples for gasoline hydrocarbons Field instruments such as the PID are useful for <br /> Indicating relative levels of gasoline hydrocarbon vapors but do not detect the concentration <br /> of gasoline hydrocarbons present with the same precision as laboratory analyses Subjective <br /> evidence of gasoline hydrocarbons such as soil discoloration or obvious odor was noted <br /> Sample_Labeling.and Handling <br /> Soil samples selected for possible laboratory analysis were removed from the sampler and <br /> quickly sealed in their brass sleeves with aluminum foil, plastic caps, and Teflon tape The <br /> respective sample containers were labeled in the field with the job number, sample location, <br /> depth if applicable, and date, and promptly placed in iced storage for transport to the <br /> laboratory Chain of Custody Records were initiated in the field by the geologist and <br /> accompanied the samples to a laboratory certified by the State of California to perform the <br /> analyses requested <br /> 1I121esc/38009-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.