Laserfiche WebLink
r <br /> 1 <br /> Existing Building <br /> 0 <br /> ■ <br /> 71 l B-6o <br /> D T4 � B-13/RW-1 <br /> v_ <br /> B-12/PZ-1 <br /> o <br /> Z B-9/VW-1 B-10/VW-2 <br /> 11 8-11/VW-3 <br /> B-7 <br /> B-1/MW-1 \ <br /> rn L1 L 1- , B <br /> 2- —4 <br /> • I T2 I <br /> i T1 I <br /> Concrete Pad <br /> 0 <br /> B-5 <br /> EXPLANATION <br /> B-7 Soil Boring <br /> Q Proposed Soil Boring <br /> Underground Storage Tanks, <br /> 9-8/MW <br /> Soil Boring/ T1 550—Gallon Diesel <br /> Monitoring Well T2 1,000—Gallon <br /> RW_1 Leaded Gasoline <br /> Recovery Well T5 Former 550—Gallon Diesel <br /> B-12/PZ-1 Soil Boring/ <br /> Piezometer <br /> + Soil Boring/ <br /> Vapor--Extraction well <br /> Proposed Soil Boring/ <br /> Vapor—Extraction well 0 20 40 <br /> Map Modified from Map Provided by Approximate Scale feet <br /> Union Oil Company of California. pP (feet) <br /> �—_ PROPOSED VAPOR-EXTRACTION PLATE <br /> QrAM WELL LOCATIONS <br /> Fire Engine Company No. 2 2 <br /> �,E NO 110 West Sonora Street <br /> PROJECT NO. 38009 8009D7A Stockton California <br />