My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010314
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
ARCHIVED REPORTS_XR0010314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 5:10:35 PM
Creation date
5/27/2020 4:49:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010314
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> FIELD METHODS Ara z <br /> Site Safety Plan <br /> The site safety plan describes the basic safety requirements for the drilling of soil borings <br /> at the work site and includes propane for the vapor-extraction test. The safety plan is <br /> applicable to personnel and subcontractors of RESNA The RESNA' geologist will act as <br /> the Site Safety Officer Personnel at the site will be informed of the contents of the site <br /> safety plan before work begins A copy of the plan will be kept at the work site and will be <br /> available for reference by appropriate parties during the work Plate 1S, which shows the <br /> route to the nearest hospital, is included in the plan <br /> ,Sampling and Handling <br /> Soil samples selected for possible chemical analysis will be sealed quickly with aluminum <br /> foil, plastic caps, and tape The samples will be labeled and placed in iced storage and <br /> maintained at 4 degrees centigrade for transport to the analytical laboratory <br /> Chain of Custody Records will be initiated in the field by the geologist, updated throughout <br /> handling of the samples, and sent along with the samples to the laboratory Copies of Chain <br /> of Custody Records will be included in our final report <br /> Ground-Water Pumping Test Well Construction <br /> The pumping test well will be constructed in the boring with thread jointed, 6-inch-inner- <br /> diameter, Schedule 40 polyvinyl chloride (PVC) casing No chemical cements, glues, or <br /> solvents will be used in well construction The screened portion of the well will consist of <br /> 6-inch-diameter wire-wrapped screen casing with 0 020-inch-wide slots <br /> The screened interval will allow sampling at the air-water interface during seasonal <br /> fluctuations of the groundwater level The annular space in the well will be packed with <br /> number 3 sand to approximately 1 to 2 feet above the slotted interval. A 2-foot thick <br /> bentonite plug will be added above the sand pack The remaining annulus will be backfilled <br /> to grade with a bentonite cement slurry <br /> The well will be protected with a traffic-rated, cast-aluminum utility box equipped with a <br /> PVC skirt The box has a watertight seal to protect against surface-water infiltration and <br /> must be opened with a special wrench. The design of this box discourages vandalism and <br /> reduces the possibility of accidental disturbance of the well <br /> 38009-SW <br />
The URL can be used to link to this page
Your browser does not support the video tag.