My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010315
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
ARCHIVED REPORTS_XR0010315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 5:24:41 PM
Creation date
5/27/2020 4:49:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010315
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR 10 1991 <br /> ENVIRONMENTAL. HEALTH <br /> PERM IT/SERVECI=5- <br /> Applied GeoSystems 4191-E Power Inn Road, Sacramento, CA 95826 (916) 452-2901 <br /> • FREMONT • IRVINE • HOUSTON e BOSTON • SACRAMENTO • CULVER CITY • SAN JOSE <br /> October 17, 1990 <br /> AGS 38009-3P <br /> Mr. James Escobar <br /> Department of Public Works <br /> City Hall <br /> Stockton, California 95202-1997 <br /> Subject. Proposal and Estimated Budget for Quarterly Monitoring of Ground Water <br /> at Fire Engine Company No 2, 110 West Sonora Street, Stockton, California. <br /> Mr Escobar: <br /> At the request of the City of Stockton, Applied GeoSystems is submitting this proposal and <br /> . estimated budget for 1 year of quarterly monitoring of ground water at the subject site. <br /> Applied GeoSystems recommends conducting one sampling event and incorporating the data <br /> into the draft Applied GeoSystems Problem Assessment Report (PAR), 38009-2, dated <br /> October 18, 1990. To date we sampled water from wells MW-1 though M-3 in December <br /> 1988 and water from well MW-4 in May 1990 Our June 14, 1989 letter proposal and <br /> budget for further work at the site only included sampling for the newly installed well. The <br /> purpose of this sampling program is to monitor and evaluate the concentrations of <br /> hydrocarbons in ground water beneath the site <br /> Applied GeoSystems began an environmental investigation at the site in December 1988 to <br /> evaluate whether hydrocarbons from a leaking underground storage tank affected soil and ; <br /> ground water beneath the site Three ground-water monitoring wells were installed in <br /> December 1988, and one well was installed in May 1990. Water samples collected from <br /> these four wells contained hydrocarbons, therefore we recommended quarterly monitoring <br /> of ground water. <br /> 31 12 <br /> The attached budget includes performing the following tas 4 quart <br /> >•T , onitonng <br /> events: <br /> 0 Update the site safety plan . ` �% <br />
The URL can be used to link to this page
Your browser does not support the video tag.