My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010315
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
ARCHIVED REPORTS_XR0010315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 5:24:41 PM
Creation date
5/27/2020 4:49:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010315
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> • J1 <br /> Letter Proposal and Estimated Budget October 17, 1990 <br /> Fire Engine Company No 2, Stockton, California AGS 38009-3P <br /> ESTIMATED BUDGET <br /> Fire Engine Company No. 2 <br /> 110 West Sonora Street <br /> Stockton, California <br /> (Page 2 of 2) <br /> OTY UNIT COST TOTA <br /> EQUIPMENT AND MATERIALS (4 events) <br /> Protective clothing 4 eacn $10. 00 $40. 00 <br /> Water-level indicator 4 day 25. 00 100. 00 <br /> Bailer 4 day 25. 00 100. 00 <br /> Submersible pump 4 day 50. 00 200.00 <br /> pH meter 4 day 25. 00 100. 00 <br /> Drums 16 each 40 . 00 640.00 <br /> Subtotal: $1' 180.00 <br /> LABORATORY ANALYSES (2-WEEK TURNAROUND) <br /> Water (TPHg, BTEX) 16 each $130. 00 $2 , 080. 00 <br /> ' TPHd 16 each 130. 00 2 , 080. 00 <br /> Subtotal: $4 , 160. 00 <br /> REPORT PREPARATION (4 quarterly reports) <br /> Pro3ect Geologist 28 hr $80. 00 $2 , 240. 00 <br /> Drafter 9 hr 50. 00 450. 00 <br /> Clerk 8 hr 35. 00 280. 00 <br /> Editor 12 hr 55. 00 660. 00 <br /> Sr. Project Geologist 6 hr 120. 00 720. 00 <br /> Subtotal: $4 , 350. 00 <br /> TOTAL $14 ,924 . 00 <br /> This is not a bid or price quote but an estimated budget based on <br /> our understanding of the site and information supplied by the <br /> City of Stockton personnel . If additional laboratory analyses <br /> are necessary, or if site conditions alter the scope of the <br /> proposed work, additional charges may be necessary. If delays or <br /> unforeseen conditions are encountered, we will inform the City of <br /> Stockton as soon as possible. i <br /> 5 <br /> Applied GeoSYSAMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.