Laserfiche WebLink
13 April 2005 <br /> S AGE-NC Project No 01-0827 <br /> Page 7 of 7 <br /> • Continued quarterly groundwater monitoring,the next monitoring event is scheduled for late <br /> in the second quarter 2005 <br /> • Limit the quarterly monitoring schedule sampling to impacted ground water wells,eliminate <br /> the non-impacted wells, located more distal to the UST area, from the sampling program <br /> • Continue operation of the ozone air spargmg system <br /> 6.0. LINIITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br /> points(e g soiI and ground water samples)and subsurface conditions may vary away from these data <br /> points No other warranty, expressed or implied, is made as to the professional opinions, findings <br /> and recommendations contained in this report <br /> 10 <br /> Advanced GeoEnvironmental,Inc <br />