Laserfiche WebLink
i <br /> 17 August 2004 <br /> AGE-NC Project No 01-0827 <br />' Page 6 of 6 <br />' 5.0. RECOMMENDATIONS <br /> Based on the findings of the remediation activities recounted In this report, AGE recommends <br />' • Continued quarterly ground water monitoring, the next monitoring event is scheduled for <br /> third quarter 2004 <br />' • Continue operation of the ozone air sparging system <br /> • Removal of the analysis for TPH-d from the quarterly monitoring schedule based on very low <br /> to non-detectable historical concentrations Additionally,limit sampling to Impacted ground <br /> water wells, eliminate the non-Impacted wells,located more distal to the UST area,from the <br /> sampling program <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />�M environmental consultants practicing In this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydro geologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br />' points (ground water and soil vapor samples) and subsurface conditions may vary away from these <br /> data points No other warranty, expressed or Implied, is made as to the professional opinions, <br /> findings and recommendations contained in this report <br /> t <br />' Advanced GeoEnvironmental,Inc <br /> 1 <br />