My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
780
>
2900 - Site Mitigation Program
>
PR0009247
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 9:11:59 AM
Creation date
5/28/2020 8:50:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009247
PE
2960
FACILITY_ID
FA0004042
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
780
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515014
CURRENT_STATUS
01
SITE_LOCATION
780 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE AF CAI IFORNIA - FnvirnnmPntal Prntertinn AnPnry PFTF W1 Coni Cnvarnnr <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION +; c,!A <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 �; D s <br /> PHONE: (916) 255-3000 ' 21; P;j 3. 2 <br /> 2 a" <br /> FAX: (916) 255-3015 <br /> 14 February 1994 <br /> Mr. Randy Smith <br /> Southern Pacific Transportation Company <br /> One Market Plaza <br /> San Francisco, California 94105 <br /> SOUTHERN PACIFIC TRANSPORTATION COMPANY, OLD TRACY YARD, <br /> SAN JOAQUIN COUNTY <br /> The enclosed memorandum summarizes our recent review of the case file and your 17 December <br /> 1993 work plan for further site characterization at SPTCo's Old Tracy Yard. The soils at the site <br /> have been contaminated with lead and other metals which may pose a threat to the water quality. <br /> The full lateral and vertical extent of the soil contamination at the site has not been defined, nor has <br /> the potential effect on ground water quality been determined. <br /> There are a number of issues that need to be addressed including what the final soil cleanup levels <br /> will be at the site. However, interim remediation of the soils should begin as soon as possible. <br /> Therefore, by 15 March 1993 please submit a revised work plan which addresses all of the <br /> comments in the memorandum including a schedule for implementation of interim soil remediation. <br /> If you have any questions, please feel free to call me at (916) 255-3077. <br /> w4'ur L ' �tl/1/V <br /> 4,Joel M. Weiss <br /> Engineering Geologist <br /> JMW:jmw/ldj <br /> Enclosure <br /> cc: Mr. Mike Infurna, San Joaquin Public Health Services, Stockton <br /> Ms. Tanya Musselwhite, Industrial Compliance, Sacramento <br /> Gib <br />
The URL can be used to link to this page
Your browser does not support the video tag.