My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
780
>
2900 - Site Mitigation Program
>
PR0009247
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 9:11:59 AM
Creation date
5/28/2020 8:50:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009247
PE
2960
FACILITY_ID
FA0004042
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
780
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515014
CURRENT_STATUS
01
SITE_LOCATION
780 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Industrial Compliance <br /> 9838 Old Placerville Road Suite 100 Sacramento, CA 95827-3559 <br /> 916/369-8971 FAX 916/369-8370 <br /> September 28, 1995 <br /> IC Project No. 05100469 <br /> Mr. Joel Weiss <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road <br /> Sacramento, California 95827-3098 <br /> Re: Project Summary and Request for Schedule Extension <br /> Excavation of Lead Impacted Soil <br /> Southern Pacific Transportation Company <br /> Old Tracy Yard - Tracy, California <br /> Dear Mr. Weiss: <br /> The purpose of this letter is to summarize project status and to request a schedule extension <br /> for submittal of a report to the Regional Water Quality Control Board - Central Valley <br /> Region (Regional Board) documenting remediation of lead impacted soil at the Southern <br /> Pacific Transportation Company (SPTCo) Old Tracy Yard in Tracy, California. The <br /> summary of project status covers all items addressed during our telephone discussion on <br /> September 21, 1995. <br /> PROJECT SUMMARY <br /> Industrial Compliance (IC) has completed two periods of excavation and stockpiling of lead <br /> impacted soil at the Old Tracy Yard site. The first period of excavation/stockpiling began on <br /> July 11, 1995 and continued through July 19, 1995. Analytical results (total lead) from <br /> confirmation samples collected after the first period of excavation indicated that additional <br /> excavation was necessary in several areas. The second period of excavation/stockpiling <br /> began on August 7, 1995 and continued through August 17, 1995. Analytical results (total <br /> lead) from confirmation samples collected after the second period of excavation indicated that <br /> additional excavation was still necessary in some areas of the site. Excavation has not <br /> continued due to the lack of space for stockpiling additional soil on site. There are presently <br /> an estimated 7,650 tons of impacted soil stockpiled on site. The stockpiles are fenced and <br /> covered with visqueen secured by sandbags. The excavation areas are also fenced and the <br /> exposed soil in each area has been covered (sprayed) with a non-toxic material for dust <br /> control. <br /> 469-013.ltr/09-28-95/u/kwrigh/keydata/oldtracy/letters <br /> Denver•Phoenix•Kansas City•Dallas•Houston•Los Angeles•Sacramento•Little Rock•Knoxville <br /> A Subsidiary of SP Environmental Systems.Inc. m <br /> arc <br />
The URL can be used to link to this page
Your browser does not support the video tag.