My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
780
>
2900 - Site Mitigation Program
>
PR0009247
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 9:11:59 AM
Creation date
5/28/2020 8:50:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009247
PE
2960
FACILITY_ID
FA0004042
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
780
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515014
CURRENT_STATUS
01
SITE_LOCATION
780 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TA K' Tfl <br /> SMVICf <br /> Mr. Joel Weiss <br /> September 28, 1995 AM IQ: 52 <br /> Page 3 <br /> metals (except lead) which have not been detected during previous monitoring. Metals which <br /> will be deleted are antimony, arsenic, beryllium, cadmium, mercury, molybdenum, nickel, <br /> selenium, silver, and thallium. <br /> PROJECT SCHEDULE <br /> The date presently established for submittal of a report to the Regional Board on the results <br /> of remediation of lead impacted soil at the Old Tracy Yard is October 6, 1995. Based on the <br /> project status as summarized above, IC requests an extension of the reporting date to <br /> December 22, 1995. This revised submittal date assumes one week for loading and shipping <br /> of the existing stockpiled soil, three to four weeks for completion of excavation and receipt <br /> of final confirmation sample and stockpile characterization sample results, three weeks for <br /> scheduling, loading and shipping the additional stockpiled soil, and four to five weeks for <br /> report preparation, SPTCo review, and submittal as a draft to the Regional Board. <br /> If you have questions regarding information provided or would like to discuss the requested <br /> submittal date revision in greater detail, please call the undersigned at (916) 369-8971 or Mr. <br /> Randall Smith of SPTCo at (415) 541-2559. <br /> Sincerely, <br /> INDUSTRIAL COMPLIANCE <br /> 62- Ot/6i6v;D <br /> Richard L. Bateman, R.G. <br /> Project Manager <br /> RLB/dao <br /> cc: Mr. Randall Smith, Southern Pacific Transportation Company <br /> Mr. Mike Infurna, San Joaquin County Department of Public Health <br /> 469-013.ltr/09-28-95/u/kw righ/keydata/oldtracy/letters <br />
The URL can be used to link to this page
Your browser does not support the video tag.