My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
780
>
2900 - Site Mitigation Program
>
PR0009247
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 9:09:34 AM
Creation date
5/28/2020 8:53:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009247
PE
2960
FACILITY_ID
FA0004042
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
780
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515014
CURRENT_STATUS
01
SITE_LOCATION
780 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental <br /> Mr.Michael J.Infurna Resources <br /> 16 December 1998 Management <br /> Page 4 <br /> ERM will direct the drilling subcontractor to drill out wells with more <br /> than 3 feet of silt or those that have experienced casing failure. Prior to <br /> drilling, a steel guide rod will be inserted in the well to ensure that the <br /> drill stem stays centered on the well. Hollow-stem augers (with a <br /> diameter equivalent or larger than those originally used to drill the well <br /> borehole) will then be used to drill out the grout seal, casing, and filter <br /> pack. The abandonment borehole will extend into native material <br /> approximately 2 feet further than the original borehole. The over drilled <br /> borehole will be backfilled with neat cement using a tremmie pipe as the <br /> augers are removed from the borehole to within 5 feet of the ground <br /> surface. At depths less than 5 feet bgs,the cement will be poured directly <br /> into the borehole. <br /> ERM will maintain drill cuttings (if any) generated during well <br /> abandonment procedures onsite, and will sample and dispose the <br /> materials in accordance with applicable state and federal laws. Steam <br /> clean rinsate and water displaced during well abandonment will also be <br /> stored onsite, and will be sampled and disposed in accordance with <br /> applicable state and federal laws. <br /> In accordance with permit requirements, ERM will call PHS-EHD 48 <br /> hours prior to abandonment activities to coordinate the required <br /> inspections. <br /> We appreciate your prompt attention to this proposed workplan and <br /> application. If you have any questions or comments regarding this <br /> request, please contact me at (925) 946-0455,or Mr. John Moe of UPRR at <br /> (415) 541-7020. <br /> Sincerely, ��RED GEG�Qc <br /> �r <br /> MICHAEL E. � <br /> .�► QUILUN <br /> Michael E. Quillin, R.G. #5315 <br /> Program Director `rlq�F OF CA <br /> Enclosures <br /> cc: Mr. John Moe, UPRR <br />
The URL can be used to link to this page
Your browser does not support the video tag.