My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
749
>
3500 - Local Oversight Program
>
PR0545698
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 9:55:15 AM
Creation date
5/28/2020 9:47:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545698
PE
3528
FACILITY_ID
FA0009775
FACILITY_NAME
CONCRETE INC - STKN-STANISLAUS
STREET_NUMBER
749
Direction
S
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14723006
CURRENT_STATUS
02
SITE_LOCATION
749 S STANISLAUS ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. a. Describe the method that will be utilized to purge and/or Inert the tank(s)t <br /> t.. 1g) will .Ei.rzV he t -Pie n sed—er alnA p1mped—n1g, Nndr the <br /> 'i <br /> o mount of dr <br /> gasoline) will be added to the tank(s) and then monitored with an LEL meter. <br /> b. Tank/Piping Hauler: <br /> L <br /> NameJim Thorpe Oil, Inc. <br /> L, Address 351 N. Beckrnan Rd./ 11.0. Box 357 City Lodi, CA ZIP 95241--0357 <br /> Phone No.L209 462-4581 <br /> ` IIanhr Registration do (ir hauled as hazardous) 2667 <br /> c. Tank/Plping Disposal Site: <br /> Name Schnitzer-Steel products <br /> Address 12000 Folsou, Blvd . Cityiiancho Cordova Zip 95742_ <br /> Phone No.(---916 ) 985-4810 <br /> EPA 1130 (if transported to a permitted TSD racillty) <br /> 9. Describe, In detail, how the soil and/or water sample(s) beneath the tank and piping will be obtatnedr <br /> V <br /> After tank removal we will excavate 2 to 3 feet under the former tank location <br /> into native soil at theappropriate locations with the backhoe at the direction <br /> of the E13U Rep. on site.Sam les will be taken fran the backhoe bucket. <br /> to. Describe hose the excavation will be backfilled with suitable material upon removals <br /> Backfill of the excavation will be coin leted at the appropriate time during this project. <br /> A determination of the most cost effective method will be made and undertaken. Fill <br /> material will be what is the most cost effective for the final desired condition. <br /> ,,. <br /> it. Unndling or excavated soli: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> ,.. 6 Mil plastic sheeting. <br /> b) What will be the final destination or the excavated stockpile? <br /> A determineation will be made at the appropriate time. <br /> �. c) Contaminated Soll Uazardous Waste Haulen <br /> Name Oill.ard Trucking IIanier Registration # 1715 <br /> ` Address 3291 Beyers Rd./Rt. 1 Bx. 73Bron Ca <br /> city Y Zip 94514 <br /> Thane No. 5 �) 634-6350 <br /> v. Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.