My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 9:57:12 AM
Creation date
5/28/2020 9:50:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI&EEALT H SEIMCES <br /> SAN JOAQUIN COUNTY , <br /> ENVIRONMENTAL HEALTH DIVISION W.. <br /> Karen Furst, M.D., M.P.H., Health Officer P <br /> 304 East Weber Avenue,Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> CLIFF BAILEY <br /> CALIFORNIA STATE UNIVERSITY STANISLAUS <br /> 801 MONTE VISTA AVENUE <br /> TURLOCK CA 95382 <br /> RE: CALIFORNIA STATE UNIVERSITY STANISLAUS <br /> 1252 N STANISLAUS ST <br /> STOCKTON CA 95202 <br /> WORKPLAN: Work Plan for Additional Soil and Groundwater Investigation <br /> DATED: 10/5/01 <br /> PREPARED BY:Condor <br /> APPROVED X <br /> DISAPPROVED ❑ <br /> ADDENDUM ❑ Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN(H&S 25299.37,subd.(c)(3).): <br /> 1. Advance three paired CPT borings and four direct push borings to depths of 75 feet bgs. Collect <br /> soil and water samples. Installation of three to four monitoring wells. . <br /> 2. Laboratory analysis of soil and water samples for total petroleum hydrocarbons,BTEY,and volatile <br /> organic compounds. <br /> 3. Water supply well search of a 2,000-foot radius around the site. <br /> 4. Preparation of a summary report., <br /> COMMENTS AND CONDITIONS: <br /> 1. Wells must be constructed in accordance with San Joaquin County standards as well as California <br /> State standards. <br /> 2. Monitoring well screen intervals for shallow monitoring wells should be 20 feet. <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN(H&S 25299.37,subd.(Q(3).): <br /> None. <br /> DATED 11/14/01 BY Rebecca E. SetliffEHS <br /> cc: CVRWQCB—Marty Hartzell <br /> CONDOR-Don Kresse <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.