Laserfiche WebLink
- FILE COPY <br /> PUBLIC FILALTH SERVICES , ,oPa . p <br /> SAN JOAQUIN COUNTY Z.F• 8—v 4g� <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D., M.P.H., Health Officer o P <br /> q�% <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 FpR�� <br /> 209/468-3420 <br /> CLIFF BAILEY APR ® 4 2001 <br /> CALIFORNIA STATE UNIVERSITY STANISLAUS <br /> 801 MONTE VISTA AVENUE <br /> TURLOCK CA 95382 <br /> RE: CALIFORNIA STATE UNIVERSITY-STANISLAUS <br /> 1252 N STANISLAUS STREET <br /> STOCKTON CA 95202 <br /> San Joaquin County Public Health Services,Environmental Health Division(PHS/EHD)received a <br /> document titled Preliminary Investigation and Evaluation Report(report)from Condor Earth Technologies, <br /> Inc.(CET). The report was dated February 7,2001 and received at PHS/EHD March 27,2001. <br /> The report describes the soil and groundwater investigation at the California State University-Stanislaus <br /> Multi-Campus Regional Center in Stockton,California(site)on December 28 and 29,2000. The results of <br /> the investigation indicate that soil and groundwater have been impacted at the site. CET recommends <br /> installing at least three cone penetrometer borings,three direct-push borings,and three monitoring wells at <br /> the site as well as completing a sensitive receptor survey within a radius of 2,000 feet. PHS/EHD concurs <br /> with these recommendations. These recommendations are in keeping with Appendix A in the"Tri- <br /> Regional Guidelines,"which outlines the steps that should be followed in a soil and groundwater <br /> investigation associated with a leaking underground storage tank. <br /> PHS/EHD personnel are available for a meeting between you and CET personnel if desired by the Trustees <br /> of the California State University,as suggested in the report. Such meetings, while not required, do tend to <br /> move a site along faster than if a meeting is not held. Therefore,you have two options. <br /> Option 1: Arrange for a meeting between you,CET; and PHS/EHD personnel within the <br /> next 30 days,or <br /> Option 2: Submit a work plan within 45 days that explains in detail the next phase of the <br /> investigation,as described in the CET report. <br /> I <br /> If you have any questions regarding this letter,please call Dot Lofstrom at(209)468-3436. <br /> Donna Heran,Director <br /> Environmental Health Services <br /> Dot Lofstrom,R.G. j <br /> LOP/Site Mitigation Unit IV <br /> i <br /> cc: Marty Hartzell,CVRWQCB j <br /> Donald Kresse,CET <br /> fI <br /> I <br /> A Division of San Joaquin County Health Care Services f <br />