My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011952
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
ARCHIVED REPORTS_XR0011952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:07:37 AM
Creation date
5/28/2020 9:54:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011952
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 i <br /> Work Plan-Soil and Groundwater Remediation <br /> CSUS Multi-Campus Regional Center,Stockton,CA <br /> March 3,2003 <br /> ' Page 8 of 8 <br /> 5.0 REPORTING <br /> Following completion of the fieldwork and evaluation of the laboratoryanalytical data, a report will be <br /> prepared for submittal to the SJCEHD describing the results of the investigation. At a minimum the <br /> _ report will include: (1) a discussion of the site history, (2) a description of the fieldwork conducted at the <br /> site, (3)the laboratory results, (4) a scaled site plan, (5) conclusions, and(7)recommendations. <br /> 6.0 SCHEDULE <br /> Upon approval of this work plan by the SJCEHD and appropriate permits from the SJCEHD and the City <br /> 1 <br /> of Stockton, and notification from the CSUS Trustees to proceed, Condor can conduct the field elements <br /> described in this work plan within three months. Upon completion of the over-excavation activities, <br /> Condor can submit a draft copy of the soil over-excavation and remediation report to the CSUS for <br /> review and comment within six weeks. The effectiveness of ozone sparging will be discussed in the final <br /> groundwater investigation report that will be produced upon completion of the current on-site <br /> F groundwater monitoring investigations. If you have any questions, please call Don Kresse at (209) 234- <br /> 0518. <br /> 1 <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> Micheline Doyle Kipf o,/Wde�KK.esse <br /> Staff Geologist C7ifornia Registered <br /> ' Geologist#6430 <br /> ° <br /> ° <br /> l <br /> R <br /> t <br /> l <br /> x P:U024 CSUS-Multi-CampuslWork PlanlOver-Excavation Work P3anlSoil and G.W.Remediation Work Pian 3-05-03.doe <br /> LN1 CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.